My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 4:03:55 PM
Creation date
1/14/2025 10:34:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0232587
PE
2361 - UST FACILITY
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
1103 S MAIN ST MANTECA 95337
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Presto, Carol [EHD] <br />From: Gabriel Martin <Gabriel.Martin@belshire.com> <br />Sent: Tuesday, January 21, 2025 9:25 AM <br />To: Presto, Carol [EHD] <br />Cc: Jonathan Shisler; Son Nguyen <br />Subject: UST Inspection Report - Chevron 201761 (1103 S Main St., Manteca, CA 95337) <br />Hello Inspector Presto, <br />I hope this email finds you well. I'm writing to address the comments regarding the recent UST inspection <br />report for the subject site, which mentioned a concern about the signature date for the owner/operator <br />appearing prefilled. I wanted to take a moment and clarify this issue. <br />We do not "Prefill" the date that the inspection was signed. Our proprietary program allowed the <br />owner/operator to add their name, date, and signature for the DO inspection at the time the inspection was <br />completed. See example screenshots below: <br />F"Mv— Co Imp*:' - <br />sCHM.0 ; <br />Gr VWW 2, irzyx <br />lthwofiv Vow. 5.''4 t 1100 <br />V~,:1�i 1/ <br />S,r��• Cad <br />Cft&Q*~ ftc Doom <br />_ <br />Cir -1 <br />Our program placed that information directly onto the . <br />printed and placed within the compliance binder onsite. <br />L^L$ A CAM r <br />I® rut's. <br />pdf of the DO inspection report, which was then <br />Q'11:7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.