Laserfiche WebLink
SCOPE OF WORK <br /> Replace FAILED Air Quality Test OPW 6ISO for Tank 91-2 south with OPW 71SO <br /> • Remove existing "FAILED" Overfill Valves for Tank 91-2 (south). <br /> • Measure and Assemble Overfill Valve to restrict flow at 95% or less per local <br /> regulatory requirements <br /> • Install the new OPW Overfill Valves 71SO <br /> • Perform OPW Overfill Valve Inspection and submit a report. <br /> Demonstrate passing Overfill Valve test for the Inspector to confirm regulatory <br /> compliance. <br /> 1 <br />