Laserfiche WebLink
BELOW GROUND PRODUCTS www.opwgiobal.com i <br /> OPW 71SO Overfill Materials Important <br /> Prevention Valves { In order to prevent product <br /> Valve Body: Cast aluminum spillage from the Underground <br /> The CARB-certified OPW 71 SO Storage Tank(UST),properly <br /> Float: Nitrile rubber, closed cell foam maintained delivery equipment <br /> vapor-tight Overfill Prevention Valve and a proper connection at the <br /> is designed to prevent the overfill of Valve:Aluminum z tight-fill adaptor are essential. <br /> underground storage tanks by providing Seals:Vlton® Delivery personnel should <br /> a positive shut-off of product delivery. Upper & lower Drop Tube: Aluminum �. to managed and trained <br /> p p y pp p ; to inspect delivery elbows <br /> The shut-off valve is an integral part of Plastic parts:Acetal and hoses for damaged and <br /> the drop tube used for gravity filling. p �, missing parts.They should <br /> The OPW 71 SO allows easy installation Hardware: Stainless steel �cpgg always make certain there <br /> lll <br /> r is a positive connection <br /> (without breaking concrete) and requires <br /> Features between the adaptor and <br /> no special manholes, elbow.If delivery equipment <br /> ♦ Simple, Easy and Quick is not properly maintained, <br /> The OPW 71 SO is a vapor-tight two- Installation —no excavation or or the elbow is not securely <br /> e shut-off valve.When the liquid coupled to the adaptor,a <br /> stage q special manholes required. serious spill may result when <br /> level rises to about 95% of tank ♦ Economical —costs a fraction the DPW71SO closes,causing <br /> capacity,the valve mechanism is a hazard and environmental <br /> released, closing automatically with <br /> of expensive, complicated and contamination.the flow.This reduces the flow rate to difficult-to-install valves. <br /> approximately 5 gpm through a bypass ♦ Furnished Complete—supplied i NOTE:The OPW 71 SO is <br /> valve.The operator may then stop the with new upper and lower drop tubes, designed for use on tight-fill <br /> gravity drop applications only. <br /> filling process and disconnect and drain mounting hardware and thorough Do not use for pressure <br /> the delivery hose.As long as the liquid instructions for quick job site time. fill applications. <br /> exceeds the 95% level,the valve will ♦ Completely Automatic Operation <br /> close automatically each time delivery —no prechecks to perform, no resets • Retrofits Directly—for both new <br /> is attempted. and no overrides to be broken and existing tanks with 4" fill risers. <br /> If the delivery is not stopped and the or abused. ♦ Quick Drain Feature — <br /> liquid rises to about 98% of tank ♦ No Pressurization of the Tank— automatically drains hose when head <br /> capacity,the bypass valve closes operates directly from liquid level. pressure is relieved, <br /> completely. No additional liquid can flow ♦ Will Accept a Dipstick ♦ Best Flow Rate in The Industry* <br /> into the tank until the level drops below <br /> a reset point. for Gauging *OPW Test Lab results <br /> NOTE:The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems: <br /> Authority Having Jurisdiction (AHJ) and ♦ Completely Automatic faster fill times and reducing <br /> review local, state,and national codes to Operation—does not rely on the spill risk, <br /> determine the regulatory requirements alertness or speed of response of the ♦ Seeds Deliver Operations <br /> erations <br /> governing shut-off capacity in your delivery attendant for certainty of —p product flows unimpeded into <br /> region,as well as take into account overfill prevention. the tank until the hose "kick" that <br /> other considerations such as extreme <br /> tank tilt. In all cases,the upper tube ♦ Keeps the Top of UST"Dry," accompanies the valve shut-off <br /> must protrude into the tank at least per EPA Requirements— provides a clear signal that the <br /> 6 112" to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut-off level. <br /> off flow into the tank completely before bung fittings and the need for ♦ Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines. Installation—in both two-point <br /> EPA requirements. ♦ Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow—allowing additional excavation, manholes or <br /> 71 SO Instruction Sheet Order vent piping are required. <br /> Number: H15524PA <br /> Look for this label for <br /> Listings and ` authentic OPW EVR <br /> 0— Ulr' �' Approved products. <br /> California Air <br /> Certifications Resources Board or w. OPW 71SOM is EVR Approved for E85 <br />