Laserfiche WebLink
Vapor Intrusion Assessment Work Plan Project number:60653972 <br /> Pursuant to Monitoring and Reporting Program(MRP)Number(No.)R5-2003-0703 (dated March 27, <br /> 2003)and MRP No.R5-2010-0818(dated August 10,2010)issued by the CVRWQCB, groundwater <br /> monitoring and reporting was performed from October 1996 to September 2019. Starting in the 3rd <br /> Quarter 2019,MNA monitoring and reporting has been ongoing at the Site pursuant to MRP No.R5- <br /> 2019-0906(dated November 6,2019). <br /> 1.4 Remedial Action Summary <br /> In July 1995,Pilko conducted the Phase 2 Site Investigation of BP Chemicals'Applied Aerospace <br /> Composites Facility at the Site following the February 1995 sale of the property.The investigation was <br /> authorized by BP to identify the areas on site impacted by previous operations. Groundwater and soil <br /> vapor samples were collected from 65 locations at the Site by Transglobal Environmental Geochemistry, <br /> Inc. (TEG). Soil vapor samples were collected at 6 and 12 feet below ground surface(bgs)and analyzed <br /> from VOCs. This investigation detected the highest VOC concentrations near the Former Hazardous <br /> Material and Waste Storage Area with concentrations of 1,1-dichloroethylene(1,1-DCE)between 10 and <br /> 80 microgram per liter(µg/L)and 1,1,1-trichloroethane(1,1,1-TCA)between 1 and 26 µg/L. Small <br /> concentrations of these same VOCs were detected near the Sewer Line and Lift Station at 1 (1,1,1-TCA) <br /> and 3 (1,1-DCE) µg/L.Additional detections occurred in the,at the time,undeveloped area in the western <br /> portion of the Site,with the highest concentrations of 1,1,1-TCA and 1,1-DCE at 11 and 54 µg/L,, <br /> respectively(Pilko 1995). <br /> Following the Pilko investigation,Parsons installed soil vapor extraction(SVE)well VEW 1 for pilot <br /> testing in 1997(Parsons 1997). Based on the effectiveness of the pilot study test,Parsons submitted the <br /> August 1998 Remedial Action Work Plan(Parsons 1998b),recommending SVE and groundwater <br /> extraction and treatment system(GWETS)as viable technologies for soil and groundwater remediation in <br /> the source area.An SVE treatment system and GWETS were installed and began operation in May 1999 <br /> and focused on source area treatment. The Remedial Alternatives Evaluation(Parsons 1999a)was then <br /> submitted to evaluate remediating the entire Site,and the following alternatives were evaluated: <br /> • Alternative A: Source Area Remediation and MNA <br /> • Alternative B: Expansion of Existing Groundwater Extraction System <br /> • Alternative C:Air Sparging with SVE <br /> Alternative A,which included soil(via SVE)and groundwater(via GWETS)treatment in the source area <br /> with MNA for the rest of the Site,was recommended as the most favorable remedial alternative. <br /> However, CVRWQCB's February 11, 1999,response to the 1998 Fourth Quarter Monitoring Report <br /> indicated that the MNA parameters yielded limited evidence to support natural attenuation and <br /> recommended other remedial alternatives besides natural attenuation be utilized to enhance GWETS.In <br /> addition, CVRWQCB's September 16, 1999,response to the Remedial Alternative Evaluation(Parsons <br /> 1999a)stated that Alternative A would not meet the project water quality objectives(WQOs) specified in <br /> the response, and BP needed to implement Alternative B or some other alternative to capture the entire <br /> plume and meet the project WQOs. Subsequently,the GWETS was expanded in 2000 to control plume <br /> migration outside the source area(Parsons 1999b). <br /> The SVE system was continuously operated from May 25 to August 17, 1999 and was monitored for <br /> effectiveness by 17 nested vapor monitoring points installed across six locations.Adjusted operations to <br /> modify vacuum field and change vapor flow paths were conducted from September to March 2000. The <br /> system was given a 7-month rest period then operated continuously from September to December 2000, <br /> where it was terminated due to a declining mass removal rate. Confirmation sampling was conducted in <br /> January 2001 at six locations to confirm low VOC concentrations found in the vapor extraction wells and <br /> monitoring points. Of the 24 samples, 18 returned non-detect for the contaminants of concern and only <br /> four samples contained detectable concentrations of the principal VOCs of concern(1,1-DCE, <br /> trichloroethene(TCE),toluene, and tetrachloroethene(PCE)). Concentrations detected were 0.03 to 0.92 <br /> Prepared for: California Regional Water Quality Control Board,Central Valley Region AECOM <br />