Laserfiche WebLink
Vapor Intrusion Assessment Work Plan Project number:60653972 <br /> 5.6.3 Field Review and Correction <br /> After completion of field data and analytical sampling paperwork, substantial efforts are made to ensure <br /> that the information recorded is accurate,complete,and legible.Data review and correction protocols <br /> have been established for both field-and office-specific data collection and processing.Technical <br /> personnel will document and review their own work and are accountable for its correctness. The intent of <br /> the review is to ensure that the forms are complete and legible and possess the required data elements. <br /> 5.6.4 Sample Shipment Paperwork <br /> Specific review considerations will be made for sample shipment paperwork.Before analytical samples <br /> are shipped from the field to the laboratory,the completed chain-of-custody paperwork will undergo <br /> thorough QC checks.First,a check is performed by field personnel after chain-of-custody forms and <br /> labels have been completed. Completion includes completing necessary fields,except the chain-of- <br /> custody time relinquished field and having the sampler sign and date the form after completion of the <br /> review. The reviewer will ensure that the following is complete: <br /> • All forms and sample labels are completed using a blue or black ballpoint pen. If an error is made <br /> on any form,the error is struck with a single line,the correct value written as close to the old <br /> value as possible, and the correction initialed and dated.The incorrect value will not be written <br /> over or obliterated in any way. <br /> • If any sample shipment or paperwork errors occur,the errors will be corrected, signed, and dated. <br /> In addition to the above reviews,the designated reviewer will also evaluate the following: <br /> • Adherence to the project schedule <br /> • Correct use of sample numbers, etc. <br /> • Correct types and numbers of sample bottles <br /> • Specification of preservation where necessary <br /> • Dates,times,and initials of corrections <br /> • Correct chain-of-custody transfers between field personnel <br /> 5.6.5 Error Detection and Correction <br /> If any document completion errors are found during the review of project documents by the PM or a <br /> designee,a correction process will be undertaken by the individual who discovered the error.If an error is <br /> discovered,the incorrect form will be sent to the individual best suited to correct the error. Once the form <br /> has been corrected, it will, in effect,become the final version of the document, suitable for report usage. <br /> 5.6.6 Data Validation <br /> Data validation will be performed on every work order,method,and matrix. This confirmation process <br /> will include the review of analytical results, associated laboratory internal QC data and field QC data <br /> reported by the analytical laboratory.Data generated will be assessed for PARCC parameters.Any data <br /> that do not meet the project limits will be flagged and/or rejected.Any rejected data will go against the <br /> project completeness objective.At a minimum,the following items will be reviewed: <br /> • Holding times <br /> • Accuracy(LCS, calibration,MS, and surrogates) <br /> • Precision(duplicates) <br /> • Sample integrity <br /> Prepared for: California Regional Water Quality Control Board,Central Valley Region AECOM <br />