Laserfiche WebLink
BAGLEY ENTERPRISES, INC. Estimate <br /> LIQUID HANDLING SOLUTIONS <br /> 2370 Maggio Circle#4 Date Estimate# <br /> Lodi,CA 95240-8828 <br /> T:209-367-4800 7/3/2024 1625 REV 1 <br /> sales@bagleyenterprises.coni <br /> Bill To: Ship To: <br /> SJC Fleet Services Division SHERIFF OPS#1 <br /> PO Box 1810 7000 N MICHAEL CANLIS <br /> Stockton,CA 95201 FRENCH CAMP <br /> ATTN:KEVIN MYOSE <br /> Qty Item Description Cost Total <br /> EXPOSE AND REMOVE MANWAY(BREAK OUT AND <br /> REMOVE 8'X 8'CONCRETE AROUND SUMP, <br /> REMOVE PIPING,ELECTRICAL,SUMP,AND PEA <br /> GRAVEL,SHORE-UP EXCAVATION) <br /> PREPARE TANK FOR SAFE ENTRY(CLEAN, <br /> VACUUM,AND DEFUME) <br /> ENTER TANK, INSPECT AND REPAIR IF POSSIBLE. <br /> CLOSE TANK <br /> TEST TANK <br /> REINSTALL REMOVED TANK TOP <br /> TEST TANK-RECEIVE APPROVALS FROM ALL <br /> AGENCIES HAVING JURISDICTION.RETURN TAN TO <br /> SERVICE. <br /> I Materials- MATERIALS NECESSARY TO REINSTALL THE TANK <br /> TOP.:MISCELLANEOUS ELECTRICAL CONDUIT AND <br /> WIRING,PIPE VALVES AND FITTINGS, <br /> MISCELLANEOUS HARDWARE SUCH AS NUTS, <br /> BOLTS,CLAMPS,ETC.PEA GRAVEL AND <br /> CONCRETE..NOTE:THIS ASSUMES THE REMOVED <br /> PIPING SUMP AND MANWAY COVER IS <br /> REUSEABLE. <br /> NOTE: IN THE EVENT THE TANK NEEDS MORE <br /> THAN MINOR REPAIR,ADDITIONAL COSTS WILL <br /> APPLY FOR RETURN TRIP TO SHIP MATERIALS AND <br /> ARRANGE FOR ADDITIONAL TECHNICIANS. <br /> EXCLUSIONS: <br /> REMOVING FUEL FROM TANK <br /> FUEL FOR TANK AFTER AGENCY APPROVAL <br /> All prices are subject to change without prior notice due to currency fluctuation, Sales Tax (7.75/a o ) <br /> fuel/shipping prices,and/or unforeseen economic circumstances. <br /> Customer Signature: TOTAL <br /> 774802 A HAZ,B,C-61 (D21,D34,D40),SDVOSB**DIR# 1000012690 <br /> wwv.bagleyenterpries.com ****GSA Contract GS-07F-0462Y***CMAS Contract 4-20-56-0051 C <br /> Page 2 <br />