My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2026 1:54:07 PM
Creation date
1/21/2025 10:52:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0232437
PE
2361 - UST FACILITY
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
7000 N MICHAEL CANLIS RD FRENCH CAMP 95231
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Obtain a complete third-party evaluation of the lining material and procedures: <br /> a.A resume, including all applicable formal training experience, from personnel who conducted the evaluation (not <br /> necessary for Underwriters Laboratories). <br /> b.An affidavit from the company that received the third-party evaluation confirming that there are no mutual financial <br /> interests between lining company and testing organization (not necessary for Underwriters Laboratories). <br /> c.A description of the testing organization's formal periodic inspections of the listed/certified materials and processes. <br /> (The purpose of the formal periodic inspections is to ensure that the listed/certified materials and process continue to <br /> comply with the listing/certification.) <br /> d.A copy of the voluntary consensus standard that was used during the evaluation or a description of the equivalent test <br /> protocol, if a voluntary consensus standard was not used. <br /> e.The testing organization's raw field data, laboratory results, calculations, graphs, charts, etc. <br /> f.The conclusion of the testing organization's evaluation of the lining material. <br /> g.The conclusion of the testing organization's evaluation of the lining process. <br /> h. Limitations on the listing/certification, if any. <br /> i.A statement from the testing organization confirming that all equipment at the test site(s)was properly maintained and <br /> calibrated to the level of accuracy necessary for a valid evaluation. <br /> j.A statement from the lining applicator confirming that the materials that will be used are the same materials that were <br /> evaluated by the testing organization. <br /> k.A statement from the lining applicator confirming that the processes that will be used are the same processes that were <br /> evaluated by the testing organization. <br /> I.A description of tank lining processes to be used by the applicator. <br /> m.A statement from the company that received the evaluation describing training provided to the authorized applicator. <br /> 2. Does lining applicator have one of the following valid, unexpired contractors licenses: <br /> • General Engineering Contractor(A) <br /> • General Building Contractor(B) <br /> • Limited Specialty/Service Station Maintenance(C-61/D40) <br /> • Limited Specialty/Synthetic Products (C-61/D12) <br /> • Limited Specialty/Protective Coating (C-61051) <br /> • Painting and Decorating (C-33) <br /> • Plumbing Contractor(C-36) <br /> 3. Is lining a preventive upgrade or a repair of a leaking tank? <br /> • Results of soil samples <br /> • Holes that may have leaked fuel detected by special inspector <br /> • Results of tank integrity tests <br />
The URL can be used to link to this page
Your browser does not support the video tag.