Laserfiche WebLink
• Other monitoring results <br /> 4. Corrective action, if necessary. Will lining inhibit or delay corrective action, if any? <br /> 5.A guideline provided by lining company for local agency inspectors to use when conducting field inspections of tank <br /> linings. <br /> 6. Certification by special inspector that the tank is suitable for lining and continued use: <br /> a. Steel or clad tanks <br /> i. sandblast to white metal <br /> ii. ultrasound thickness test of steel walls by appropriately trained person <br /> iii. count number of holes, splits, perforations, and other defects <br /> b. Fiberglass tanks <br /> i. interior walls cleaned by wipe down <br /> ii. interior diameter measurements <br /> iii. visual check for structural, tension, or compression problems <br /> 7. Is the special inspector an appropriate registered professional engineer? <br /> 8. Holes and splits in steel tanks, if any, plugged with self-tapping bolts, boiler plugs,water-tight, hydraulic cement, or <br /> welding. <br /> 9. Striker plates installed beneath all tank openings that could be used for manual dipsticking. <br /> 10. Lining applied within 8 hours of sandblasting? <br /> 11. Berfore UST is returned to service, certification by coatings expert or special inspector that tank was lined properly: <br /> a. Steel or clad tanks <br /> i. visual check of lining <br /> ii. thickness test of lining <br /> iii. hardness test of lining <br /> iv. electrical resistance holiday detector test <br /> v. vacuum test <br /> b. Fiberglass tanks <br /> i. visual check of lining <br /> ii.thickness test of lining <br /> iii. hardness test of lining <br /> iv. vacuum test(not required if submerged by 50%of depth in ground water) <br /> 12. If a coatings expert was used, is he financially independent from the tank owner and lining company? <br /> 13.Tank integrity test conducted. <br /> 14. Continuous vapor or ground water monitoring system (tanks that have leaked only). <br /> 15.Tank lining records and test results maintained for remaining operating life of tank. <br /> 16. Spill container. <br /> 17. Overfill prevention equipment. <br /> 18. Proposed monitoring procedures for the tank(s)and piping that will be used once the UST is put back into service. <br /> 19.An emergency response plan for the facility that will be used once the UST(s) is put back into service. <br /> 20.Ten years after lining and every five years thereafter, certification by coatings expert or special inspector that the tank <br /> is suitable for continued use: <br />