My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 7:47:11 PM
Creation date
1/27/2025 4:55:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231861
PE
2361 - UST FACILITY
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15502064
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
130 S WILSON WAY STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 5. MONITORING SYSTEM AND PROGRAMMING <br /> A separate Monitoring System Certification Form must be prepared for each control panel. <br /> Make of Monitoring System Model of Monitoring System Software Version Installed <br /> Control Panel Control Panel <br /> Veeder-Root TLS-350 336.02 <br /> Attach the post-certification reports if the monitoring system is capable of generating Yes No NA <br /> either; E] Monitoring System Set-up E] Alarm History Report <br /> All monitoring equipment is operational per manufacturer's specifications? <br /> Secondary containment systems are free of damage, debris, or liquid? © 0 <br /> Are the audible and visual alarms operational? R 171 <br /> All sensors have been: 1) visually inspected for wiring kinks, breaks and residual 2 <br /> buildup on floats; and 2) tested for functionality and confirmed operational? <br /> Are all sensors installed to detect a release at the earliest opportunity in the <br /> secondary containment? <br /> The monitoring system set-up was reviewed, and proper settings confirmed? F1 EJ ID <br /> Was the monitoring control panel's backup battery visually inspected, functionally 1-f © 0 <br /> tested, and confirmed operational? <br /> Does the flow of fuel stop at the dispenser if a release is detected in the under- <br /> dispenser containment? <br /> Does the turbine automatically shut down if the piping secondary containment © © ri <br /> monitoring system fails to operate or is electrically disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment <br /> monitoring system detects a release? Which sensors initiate positive shut down? <br /> Check all that apply) ED Sump (j UDC <br /> If monitoring system alarms are relayed to a remote monitoring center, is all © El El <br /> communication equipment operational? <br /> Describe all answers marked "No"or "Fail"and proposed remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.