Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 6. SENSOR TESTING RESULTS <br /> List only sensors tested on date of this certification. List "Sensor ID" as labeled in system <br /> programming. Additional copies of this page maybe attached to accommodate all sensors tested. <br /> Sensor ID Sensor Model Component(s) Monitored Pass Fail <br /> L-1 409 87 Octane Master Annular Space ✓ 0 <br /> L-2 323 87 Octane Master STP Sump R-7 0 <br /> L-3 409 87 Octane Slave Annular Space El El <br /> L-4 323 87 Slave Turbine Sump 0 <br /> L-5 409 91 Octane Annular Space �✓ El <br /> L-6 323 91 Octane STP Sump R <br /> L-7 323 Dispenser 1 / 2 El <br /> L-8 323 Dispenser 3 /4 <br /> L-9 323 Dispenser 5 / 6 © 0 <br /> L-10 323 Dispenser 7 1 8 <br /> L-11 323 Vent Sump El El <br /> L-15 323 Reg UNLD Master Fill Sump El El <br /> L-16 323 Reg UNLD Slave Fill Sump El F1 <br /> L-17 323 Premium UNLD Fill Sump 8 <br /> -- 8 <br /> 117 <br /> El El <br /> ri EI <br /> 0 rl <br /> a a <br /> © o <br /> Describe all answers marked "No" or "Fail' and proposed remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 3 of 6 <br />