My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 7:47:11 PM
Creation date
1/27/2025 4:55:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231861
PE
2361 - UST FACILITY
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15502064
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
130 S WILSON WAY STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> B. IN-TANK GAUGING TESTING <br /> I7 Check this box if tank gauging is used only for inventory control. <br /> Check this box if NO tank gauging equipment is installed. Yes No NA <br /> Do not complete this section if either box is checked. _ <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and i 0 <br /> termination; and 2 tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup o 0 El <br /> to ensure that floats move freely, functionally tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? El Ej FLI <br /> Was accuracy of system's water level readings tested? El Ej I 0 <br /> Were all probes reinstalled properly? r 0 <br /> Were all items on the equipment manufacturer's maintenance checklist completed? © r] El I <br /> Probe ID Probe Model Tanks Monitored Pass Fail <br /> ® El <br /> © M <br /> El 0 <br /> E <br /> 9. COMMENTS <br /> Describe all answers marked "No"or "Fail' and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> L2 - 87 Master STP Sump 323 sensor was replaced at time of monitor cert with inspector on <br /> site. <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.