Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN �^ <br /> Date site plan was prepared.- 01/31/2025 <br /> if a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Site address: 130 SOUTH WILSON WAY STOCKTON CA 95204 <br /> 'Piping` Key <br /> (Arrows) A=Annular sensor <br /> Draining of F=Fills <br /> piping exit g, T=Turbine <br /> sump and P=Probe <br /> UDC's No T V=Vapor <br /> underground 6. X-Sump sensor <br /> drawing is L=Leak detector <br /> accurate,we 3, 5, � M=Manway <br /> cannot. B=Brine sensor <br /> speculate blue I=Smart sensor <br /> prints S=STP <br /> 1 X�._ C=Floats&Chains <br /> E_E-Stop <br /> ."s <br /> 1 <br /> ti <br /> X 87 Main <br /> x <br /> Nov <br /> P <br /> 91 <br /> X <br /> A 0 v <br /> c T <br /> ATG <br /> X O X 37 Slave <br /> A r <br /> Ventswo P <br /> CAS T <br /> V X vent <br /> Sump <br /> Page 6 of 6 <br />