My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2026 7:51:41 PM
Creation date
1/29/2025 8:29:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231708
PE
2361 - UST FACILITY
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Lookup Error
ERROR [38000] ERROR: Invalid customid as arg 3! at line 18.; Error while executing the query
Site Address
25775 S PATTERSON PASS RD TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGI G TESTING <br /> XCheck this box if tan gauging is used only for inventory control. <br /> ❑Check this box if NQ tank gauging equipment is installed. Yes' Nd NA,' <br /> Do not complete i Ws section if either box is checked. <br /> All wiring has been: 1 visually inspected for kinks, breaks and proper entry and termination; ❑ ❑ <br /> and 2 tested for qrou nd faults? <br /> Were all in-tank gaug ng probes visually inspected for damage and residue buildup to ❑ ❑ <br /> ensure that floats mo a freely, functionally tested, and confirmed operational? <br /> Was accuracy of syst m's product level readings tested? ❑ ❑ <br /> Was accuracy of syst m's water level readings tested? ❑ ❑ <br /> Were all probes reins alled properly? ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ <br /> Probe /D P obe Model Tanks Monitored Pass Fail <br /> El <br /> ❑ ❑ <br /> ❑ ❑ <br /> 9. COMMENTS <br /> Describe all answers marked "No"or"Fail'and proposed remedy. <br /> List all monitoring eqi ipment either replaced or repaired. <br /> 10. MONITORING SITE PLAN <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.