My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2026 7:51:41 PM
Creation date
1/29/2025 8:29:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231708
PE
2361 - UST FACILITY
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Lookup Error
ERROR [38000] ERROR: Invalid customid as arg 3! at line 18.; Error while executing the query
Site Address
25775 S PATTERSON PASS RD TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> econdary Containment Testing Report Form <br /> 8. SUMP1UDC TES <br /> Test Method Develo ed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Us d: Caldwell Level Change Indicator <br /> SumplUDC ID UDC 1&2 UDC 3&4 UDC 5&6 UDC 7&8 <br /> Sump Manufacturer Environ BRAVO Environ BRAVO <br /> Sump Depth (inche ) 29 112" 26 116" 30" 26" <br /> Sump Bottom to To of 11" 10 112" 11" 12 112" <br /> Highest Pipe Penet ation <br /> (inches) <br /> Test: Start Time 8:00 a.m. 8:00 a.m. 8:22 a.m. 8:22 a.m. <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 8:30 a.m. 8:30 a.m. 8:52 a.m. 8:52 a.m. <br /> Final Reading .001 .001 .001 .001 <br /> Change in Readin 0 0 0 0 <br /> Pass/Fail Criteria .005/30 min. .005/30 min. .005130 min. .005130 min. <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID 91 STP Sump 87S STP Sump 87MSTP Sump Diesel STP S <br /> Sump Manufactur r XERXES XERXES XERXES XERXES <br /> Sump Depth (inch s) 58" 58 112" 69" 58112" <br /> Sump Bottom to T p of 31" 32" 32" 33" <br /> Highest Pipe Pen tration <br /> (inches) <br /> Test Start Time 10:40 a.m. 10:25 a.m. 11:30 a.m. 11:50 a.m. <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 11:110 a.m. 10:55 a.m. 12:00 p.m. 12:20 p.m. <br /> Final Reading .001 .001 .001 .001 <br /> Change in Readi g 0 0 0 0 <br /> Pass/Fail Criteria .005/30 min. .005/30 min. .005/30 min. .005/30 min. <br /> Tightness Test R suits ® Pass ❑ Fail ® Pass ❑ Fail M Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies c f this page may be attached. <br /> All tests marked " ail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS ection. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.