Laserfiche WebLink
Underground Storage Tank <br /> econdary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard E Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum E Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID 91 Fill Sump 87SFill Sump 87MFill Sump Diesel Fill <br /> Sump Manufacturer XERXES XERXES XERXES XERXES <br /> Sump Depth (inches) 49 1/2" 52" 52 1/2" 54" <br /> Sump Bottom to Top of 36" 36" 36" 35" <br /> Highest Pipe Pene ration <br /> (inches) <br /> Test Start Time 12:30 p.m. 12:50 p.m. 1:40 p.m 1:66 P.M. <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 1:00 P.M. 1:20 p.m. 2:10 p.m. 2:25 p.m. <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria .005/30 min. .006/30 min. .005/30 min. .005/30 min. <br /> Tightness Test R ults E Pass ❑ Fail ® Pass ❑ Fail E Pass ❑ Fail E Pass ❑ Fail <br /> SumpIUDC ID <br /> Sump Manufacturer <br /> Sump Depth (inch s) <br /> Sump Bottom to I op of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Readi g <br /> Pass/Fail Criteria <br /> Tightness Test R sults ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass E Fail ❑ Pass ❑ Fail <br /> Additional copies c f this page may be attached. <br /> All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />