Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by © Manufacturer 0✓ Industry Standard © Professional Engineer <br /> Test Type 0 Pressure Vacuum ❑I— Hydrostatic <br /> Test Equipment Used: Vacuum Guage <br /> Tank ID 87 91 Diesel <br /> Tank Manufacturer Xerxes Xerxes Xerxes <br /> Tank Capacity 12K 12K 12K <br /> Test Start Time 09:50 10:10 10:20 <br /> Initial Reading -10 Hg -10 Hg -10 Hg <br /> Test End Time 10:50 11:10 11:20 <br /> Final Reading -10 Hg -10 Hg -10 Hg <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria +/-0 +/-0 +/-0 <br /> Tightness Test Results M✓ Pass 0 Fail I ® Pass © Fail I ® Pass © Fail © Pass 0 Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by Manufacturer 0 Industry Standard © Professional Engineer <br /> Test Type © Pressure 0 Vacuum © Hydrostatic <br /> Test Equipment Used: Pressure Guage <br /> Pipe Run ID 87 91 Diesel <br /> Pipe Manufacturer Smith Smith Smith <br /> Test Start Time 09:30 09:30 09:30 <br /> Initial Reading 5 Psig 5 Psig 5 Psig <br /> Test End Time 10:30 10:30 10:30 <br /> Final Reading 5 Psig 0 Psig 0 Psig <br /> Change in Reading 0 5 5 <br /> Pass/Fail Criteria +/-0 +/-0 +/-0 <br /> Tightness Test Results Pass Fail © Pass ®✓ Fail I © Pass ID Fail 0 Pass 0 Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results [M Pass 0 Fail 0 Pass r] Fail I 0 Pass 0 Fail C Pass 0 Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />