Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by © Manufacturer 0 Industry Standard © Professional Engineer <br /> Test Type El Pressure © Vacuum Hydrostatic <br /> Test Equipment Used: OMNTEC Proteus CLD Series <br /> Sump/UDC ID UDC 9-10 UDC 11-12 <br /> Sump Manufacturer OPW OPW <br /> Sump Depth (inches) 30 30 <br /> Sump Bottom to Top of 12 12 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 14:19 14:19 <br /> Initial Reading 6.757 11.856 <br /> Test End Time 14:34 14:34 <br /> Final Reading 6.757 11.856 <br /> Change in Reading 0.0000 0.0000 <br /> Pass/Fail Criteria 0.0020 0.0020 <br /> Tightness Test Results © Pass Fail ©✓ Pass © Fail © Pass 0 Fail © Pass 0 Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ® Pass ® Fail © Pass [7 Fail © Pass 0 Fail 0 Pass 0 Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />