My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 8:35:14 AM
Creation date
2/13/2025 10:49:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231604
PE
2361 - UST FACILITY
FACILITY_ID
FA0000650
FACILITY_NAME
GAS AND SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1002 FRONTAGE RD RIPON 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by 0 Manufacturer 0 Industry Standard 0 Professional Engineer <br /> Test Type © Pressure r Vacuum © Hydrostatic <br /> Test Equipment Used: vacuum gauge <br /> Tank ID #1 regular/#2 super <br /> Tank Manufacturer Modern welding <br /> Tank Capacity 12,000/8,000 split <br /> Test Start Time 10:30 am <br /> Initial Reading 10"vacuum <br /> Test End Time 12:30 pm <br /> Final Reading 10"vacuum <br /> Change in Reading 0 <br /> Pass/Fail Criteria zero loss <br /> 11 Tightness Test Results E Pass 0 Fail 0 Pass 0 Fail Pass R7 Fail 0 Pass 0 Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by 0 Manufacturer E] Industry Standard 0 Professional Engineer <br /> Test Type 0 Pressure 17 Vacuum 0 Hydrostatic <br /> Test Equipment Used: pressure gauge 0-30 psi <br /> Pipe Run ID regular super <br /> Pipe Manufacturer NOV NOV <br /> Test Start Time 10:30 am 10:30 am <br /> Initial Reading 5 psi 5 psi <br /> Test End Time 11:30 am 11:30 am <br /> Final Reading 5 psi 5 psi <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria zero loss zero loss <br /> Tightness Test Results r Pass 17 Fail E Pass 0 Fail ❑] Pass r] Fail ❑] Pass 0 Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results 0 Pass E Fail r! Pass 0 Fail R7 Pass © Fail [M Pass © Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.