Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by Manufacturer C Industry Standard © Professional Engineer <br /> Test Type Pressure © Vacuum C Hydrostatic <br /> Test Equipment Used: Caldwell systems <br /> Sump/UDC ID 87 stp sump 91 stp sump UDC# 1-2 UDC#3-4 <br /> Sump Manufacturer unknown unknown S. Bravo S. Bravo <br /> Sump Depth (inches) 54" 54" 28" 28" <br /> Sump Bottom to Top of 20" 19" 8" 8" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11:00 am 12:00 pm 2:00 pm 2:00 pm <br /> Initial Reading 24" 23" 12" 12" <br /> Test End Time 11:30 am 12:30 pm 2:30 pm 2:30 pm <br /> Final Reading 24" 23" 12" 12" <br /> Change in Reading 0 0 0 0 <br /> Pass Fail Criteria .2 .2 .2 .2 <br /> Tightness Test Results 0 Pass rl Fail El Pass r] Fail Ej Pass E Fail E Pass 0 Fail <br /> Sump/UDC ID UDC#5-6 UDC#7-8 UDC#9-10 UDC# 11-12 <br /> Sump Manufacturer S. Bravo S. Bravo S. Bravo S. Bravo <br /> Sump Depth (inches) 28" 28" 28" 28" <br /> Sump Bottom to Top of 8" 8" 8" 8" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 12:50 pm 12:50 pm 12:15 pm 12:15 pm <br /> Initial Reading 12" 12" 12" 12" <br /> Test End Time 1:20 pm 1:20 pm 12:45 pm 12:45 pm <br /> Final Reading 12" 12" 12" 12" <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria .2 .2 .2 .2 <br /> Tightness Test Results E] Pass [I Fail El Pass [I Fail E] Pass 0 Fail F/I Pass Ll Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />