My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 8:35:14 AM
Creation date
2/13/2025 10:49:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231604
PE
2361 - UST FACILITY
FACILITY_ID
FA0000650
FACILITY_NAME
GAS AND SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1002 FRONTAGE RD RIPON 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by 0 Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type 0 Pressure ❑ Vacuum r Hydrostatic <br /> Test Equipment Used: Caldwell system <br /> Sump/UDC ID UDC# 13-14 UDC# 15-16 <br /> Sump Manufacturer S. Bravo S. Bravo <br /> Sump Depth (inches) 28" 28" <br /> Sump Bottom to Top of 8" 8„ <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 2:40 pm 2:40 pm <br /> Initial Reading 12" 12" <br /> Test End Time 3:10 pm pm 3:10 pm <br /> Final Reading 12" 12" <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria .2 .2 <br /> Tightness Test Results 0 Pass rl Fail El Pass 0 Fail r] Pass 0 Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.