Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by 0 Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type 0 Pressure ❑ Vacuum r Hydrostatic <br /> Test Equipment Used: Caldwell system <br /> Sump/UDC ID UDC# 13-14 UDC# 15-16 <br /> Sump Manufacturer S. Bravo S. Bravo <br /> Sump Depth (inches) 28" 28" <br /> Sump Bottom to Top of 8" 8„ <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 2:40 pm 2:40 pm <br /> Initial Reading 12" 12" <br /> Test End Time 3:10 pm pm 3:10 pm <br /> Final Reading 12" 12" <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria .2 .2 <br /> Tightness Test Results 0 Pass rl Fail El Pass 0 Fail r] Pass 0 Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />