Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by E Manufacturer E Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure E Vacuum ❑ Hydrostatic <br /> Test Equipment Used: 0-30inHg. 4" Vacuum Gauges w/ 0.05 graduations <br /> Tank ID T-1 87 T-2 911 T-3 DSL <br /> Tank Manufacturer Modern Welding Modern Welding <br /> Tank Capacity 12k 6k/ 6k <br /> Test Start Time 8:35am 8:35am <br /> Initial Reading -10.0 inHg -10.0 inHg <br /> Test End Time 9:35am 9:35am <br /> Final Reading -10.0 inHg -10.0 inHg <br /> Change in Reading 0.0 inHg 0.0 inHg <br /> Pass/Fail Criteria No No Loss <br /> Tightness Test Results E Pass ❑ Fail 1 E Pass ❑ Fail 113 Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by E Manufacturer E Industry Standard ❑ Professional Engineer <br /> Test Type E Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Dual 0-15psi 4" Pressure Gauges w/ 0.05 graduations <br /> Pipe Run ID T-1 87 PL T-2 91 PL T-3 Diesel PL <br /> Pipe Manufacturer A.O. Smith A.O. Smith A.O. Smith <br /> Test Start Time 8:45am 8:45am 8:45am <br /> Initial Reading 5.0psi 5.Opsi 5.Opsi <br /> Test End Time 9:45am 9:45am 9:45am <br /> Final Reading 5.0psi 5.0psi 5.0psi <br /> Change in Reading O.Opsi O.Opsi O.Opsi <br /> Pass/Fail Criteria No Loss No Loss No Loss <br /> Tightness Test Results E Pass ❑ Fail E Pass ❑ Fail E Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />