My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2026 11:56:50 AM
Creation date
2/19/2025 11:54:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231488
PE
2361 - UST FACILITY
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2501 JACKSON AVE ESCALON 95320
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ® Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: F.F.S. Incon TS-STS Sump Tester w/ + or— 0.002" graduations <br /> Sump/UDC ID T-1 87 STP T-2 91 STP T-3 DSL STP UDC #1-2 <br /> Sump Manufacturer Western Fiberglass Western Fiberglass Western Fiberglass Bravo B-2000 <br /> Sump Depth (inches) 49" 52" 53" 10" <br /> Sump Bottom to Top of 21" 16" 16" Pipe enters <br /> Highest Pipe Penetration through <br /> (inches) bottom of UDC <br /> Test Start Time 9:OOam 9:OOam 10:07am 9:OOam <br /> Initial Reading 3.0041" 4.7611" 4.1691" 0.3201" <br /> Test End Time 9:15am 9:15am 10:22am 9:15am <br /> Final Reading 3.0035" 4.7606" 4.1585" 0.3194" <br /> Change in Reading -0.0006" -0.00051, -0.0006" -0.0007" <br /> Pass/Fail Criteria + or—0.002" + or—0.002" + or— 0.002" + or— 0.002" <br /> Tightness Test Results ® Pass ❑ Fail I@ Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID UDC #3-4 <br /> Sump Manufacturer Bravo B-2000 <br /> Sump Depth (inches) 10" <br /> Sump Bottom to Top of Pipe enters <br /> Highest Pipe Penetration through <br /> (inches) bottom of UDC <br /> Test Start Time 9:00am <br /> Initial Reading 2.2378" <br /> Test End Time 9:15am <br /> Final Reading 2.2371" <br /> Change in Reading -0.0007" <br /> Pass/Fail Criteria + or— 0.002" <br /> Tightness Test Results ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> 1 <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.