My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
2300 - Underground Storage Tank Program
>
PR0543446
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2026 2:42:45 PM
Creation date
3/5/2025 3:07:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0543446
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0024656
FACILITY_NAME
7-ELEVEN #38153
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
121 S CENTER ST STOCKTON 95202
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A dOAQU1N Environmental Health Department <br /> COUNTY <br /> CP22 - UST FULL Inspection Report <br /> Facility Name: Facility Address: Date: <br /> 7-ELEVEN#38153 1 121 S CENTER ST, STOCKTON Aril 24 2025 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> requirements(TCR 12). <br /> OBSERVATION:The designated operator failed to check and note all required items on the visual inspection reports. <br /> The incorrect and missing information included the following from the inspection reports: Multiple DO reports included <br /> a computer generated "date signed". <br /> REGULATION GUIDANCE: During the visual inspection,the designated operator shall check that all required testing <br /> and maintenance for the UST system have been completed and shall check all required items on the report. <br /> CORRECTIVE ACTION: Ensure that designated operators performing visual inspections at this facility are including all <br /> of the required information on the reports. <br /> This is (Minor)Violation. <br /> 72 CA Code of Regulations 2712 2030039-Compliance with all operating permit requirements. <br /> OBSERVATION:The facility is not in compliance with the written conditions of the operating permit. A cold start was <br /> performed on 10/14/2024 without a 48 hours notification. <br /> REGULATION GUIDANCE:The owner and operator of underground storage tank(UST)systems shall comply with all <br /> requirements of the permit issued for the operation of the UST system. <br /> CORRECTIVE ACTION: Immediately take all necessary actions to bring these UST systems into compliance.A <br /> double permit fee will be <br /> This is (Class 2)Violation. <br /> 77 CA Code of Regulations 2712(f)2030073- Facility has corrected cited violations within 30 days of receiving report. <br /> OBSERVATION:An inspection was last done on 4/11/2025 and an inspection report was issued identifying information <br /> to be submitted to bring this site into compliance. This information was required to be submitted by 5/11/2024. This <br /> information has not been received resulting in a non-compliant status for this facility. <br /> REGULATION GUIDANCE:An operator that receives an inspection report shall have 30 days to submit a written <br /> response that includes a statement documenting corrective actions taken or proposing corrective actions which will be <br /> taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted within 30 days of receiving an inspection report. <br /> This is a repeat violation (Class 2) Violation. <br /> Overall Inspection Comments: <br /> An inspection checklist was provided to the facility operator on the day of inspection. A complete report was <br /> finished on 5.19/2025 and replaces the initial checklist. <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, within 30 days of receiving the complete inspection report. <br /> FA0024656 PR0543446 SCO01 04/24/2025 <br /> EHD Rev.12/06/2021 Page 6 of 7 CP22-UST FULL OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.