Laserfiche WebLink
Groundwater Well Installation Work Plan Sharpe Army Depot <br /> Lathrop, California <br /> activities may prevent disposal at the South Balloon GWTP.As required for offsite disposal, liquid IDW will <br /> be sampled and characterized to determine appropriate disposal by applicable laws and regulations. A <br /> disposal facility will be identified following characterization. <br /> Solid non-hazardous waste(e.g.,disposable personal protective equipment and sampling equipment)will <br /> be wiped clean of visible contamination and disposed of in a municipal waste receptacle. Ahtna will <br /> coordinate with the Presidio of Monterey DPW-E to sign the required waste manifests. A copy of the <br /> signed manifests will be provided to the DPW-E. <br /> 3.4 Field Documentation and Photographic Record <br /> Ahtna will maintain field documentation sufficient to recreate field activities. The following information <br /> will be recorded: <br /> • Location <br /> • Date and time <br /> • Identity of people performing an activity <br /> • Weather conditions <br /> • Logs of observations and activities conducted <br /> • Sample identification numbers and chain of custody numbers <br /> Field measurements and calibration results (including numerical values, units, and instrument identity) <br /> are recorded in a field log form (Appendix B). <br /> During the construction of each extraction well, as-built diagrams of each well will be prepared by the <br /> Field Geologist (Appendix B). <br /> 3.5 Schedule <br /> Well-installation activities for onsite wells (EWC6, EWC7, MW549C,and MW550C) and offsite monitoring <br /> wells (MW551B, MW551C, and MW552C) are anticipated to begin in the fourth quarter of 2023. A <br /> schedule for offsite extraction wells (EWC8, EWC9, and EWCC7) installation activities cannot be <br /> anticipated at this time as the Army will need to first negotiate access agreements with the UPRR. <br /> 4.0 Quality Control and Quality Assurance <br /> Quality Control (QC) encompasses the actions that control the attributes of the material,sample, process, <br /> component,system,or facility in accordance with predetermined quality requirements.The QC inspection <br /> system used by Ahtna personnel for installing groundwater wells is based on three phases of QC for each <br /> definable feature of work: the preparatory phase,the initial phase, and the follow-up phase. <br /> During the preparatory phase, the work necessary to initiate the activity is checked before fieldwork <br /> begins.The phase is conducted in a meeting format during the daily pre-work health and safety meeting. <br /> Participants include onsite Ahtna personnel, the USACE representative, and onsite drilling personnel. <br /> During the meeting, information regarding the schedule, procurement, and the status of the related <br /> construction activity are shared and discussed. Lessons learned from previous events are shared and <br /> discussed. <br /> Ahtna Environmental,Inc. 18 <br />