Laserfiche WebLink
Groundwater Well Installation Work Plan Sharpe Army Depot <br /> Lathrop, California <br /> 6.0 References <br /> Albion Environmental, Inc., 1997. Burrowing Owl Management Plan, Sharpe Depot. November. <br /> Ahtna Environmental, Inc. (Ahtna), 2022a. FFA Annual Progress Report: October 2020-September 2021, <br /> Sharpe Army Depot, Lathrop, California. Final. Revision 1. May. <br /> Ahtna, 2022b. Quality Assurance Project Plan, Groundwater and Groundwater Treatment Monitoring, <br /> Sharpe Army Depot, Lathrop, California. Final. March. <br /> Ahtna, 2022c.Accident Prevention Plan, Sharpe Army Depot, Lathrop, California. Final.June. <br /> Ahtna, 2022d.Site Waste Management Plan, Sharpe Army Depot, Lathrop, California. Final.June. <br /> ASTM International, 2017. Standard Practice for Description and Identification of Soils (Visual-Manual <br /> Procedures). ASTM D2488—17. <br /> DTSC, 2014. Well Design and Construction for Monitoring Groundwater at Contaminated Sites.June. <br /> ESE, 1996. Record of Decision Basewide Remedy for DDRW-Sharpe Site. Final. February. <br /> ESE, 1993. Remedial Investigation/Feasibility Study at DDRW-Sharpe Site Record of Decision, Operable <br /> Unit 1. Final.January. <br /> Hantush, M.S., 1956. Analysis of Data from Pumping Tests in Leaking Aquifers. Trans. Amer. Geophys. <br /> Union,Vol. 37, pp. 702-714. <br /> Jacob, C.E., 1950. Flow of Ground-Water in Engineering Hydraulics. Wiley&Sons. <br /> Jacob, C.E., 1963. Determining the Permeability of Water Table Aquifers. USGS Water Supply Paper,1536- <br /> I, pp 245-271. <br /> Neuman, S.P., 1975. Analysis of Pumping Test Data from Anisotropic Unconfined Aquifers Considering <br /> Delayed Yield Gravity Response. Water Resources Research,v. 11, pp. 329-342. <br /> URS, 2009. DDJC-Sharpe Comprehensive Cone Penetrometer Investigation Results Report. Final. October. <br /> URS Group, Inc. (URS), 2011. Final Amendment to the Record of Decision Basewide Remedy for Defense <br /> Distribution Depot San Joaquin—Sharpe Site(Operable Unit 2—Soils).June. <br /> URS, 2014. Final Explanation of Significant Differences to the Record of Decision Operable Unit 1, Defense <br /> Distribution Depot San Joaquin—Sharpe Site. September. <br /> USACE, 2014. Safety and Health Requirements. EM 385-1-1. November 30, 2014. <br /> USEPA, 1986. RCRA Ground-Water Monitoring Technical Enforcement Guidance Document. September. <br /> Ahtna Environmental,Inc. 20 <br />