My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
700
>
2900 - Site Mitigation Program
>
PR0542675
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 10:41:30 AM
Creation date
3/11/2025 2:50:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542675
PE
2954 - USEPA - SITE PROJECT
FACILITY_ID
FA0024553
FACILITY_NAME
SHARPE ARMY DEPOT
STREET_NUMBER
700
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
700 ROTH RD LATHROP 95330
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fieldwork Documentation Field Standard Operating Procedure <br /> SWE-FSOP-001;Revision 1 Ahtna Southwest Environmental Operations <br /> If the fieldwork is a long-term task such as operating an O&M treatment system, remedial actions (e.g., <br /> excavation and disposal), or other qualifying fieldwork, the timeframe for producing the data package <br /> should be defined in the PgMs project instructions, but that period should not exceed one per year or end <br /> of the contract period. <br /> 5.0 Quality Assurance/Quality Control <br /> Conduct the 3-Phases of Quality Control Method described in the project work plans. <br /> Quality Assurance (QA) and QC procedures for field documentation review will be performed by the <br /> FTL/Site Supervisor and checked by the PL to ensure the content and level of detail comply with this SOP. <br /> The FTL/Site Supervisor can approve variances and fieldwork problems in coordination with the PL. The <br /> FTL/Site Supervisor should try to resolve the issue so that work can continue; however, should the <br /> variance/incident/problem affect the contracted scope of work or a project decision made from the <br /> evaluation of date,the resolution must be coordinated with PgM and SWE Field QC Manager if corrective <br /> action is needed.The PgM should notify the SWE Quality Assurance Manager of all corrective actions. <br /> 6.0 Documentation Review <br /> The FTL is responsible for the daily review of the fieldwork documentation for compliance with <br /> requirements (Section 4.0 "Procedures") and legibility. Errors and omissions should be explained and <br /> revisions to an entry signed and dated by the FTL. <br /> The PL is responsible for reviewing and signing approved documents stored in the project file (Section <br /> 4.1). <br /> 7.0 References <br /> U.S. Department of Defense, 2013. DoD Environmental Field Sampling Handbook, Revision 1.0.April. <br /> Page 15 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.