Laserfiche WebLink
Fieldwork Documentation Field Standard Operating Procedure <br /> SWE-FSOP-001;Revision 1 Ahtna Southwest Environmental Operations <br /> If the fieldwork is a long-term task such as operating an O&M treatment system, remedial actions (e.g., <br /> excavation and disposal), or other qualifying fieldwork, the timeframe for producing the data package <br /> should be defined in the PgMs project instructions, but that period should not exceed one per year or end <br /> of the contract period. <br /> 5.0 Quality Assurance/Quality Control <br /> Conduct the 3-Phases of Quality Control Method described in the project work plans. <br /> Quality Assurance (QA) and QC procedures for field documentation review will be performed by the <br /> FTL/Site Supervisor and checked by the PL to ensure the content and level of detail comply with this SOP. <br /> The FTL/Site Supervisor can approve variances and fieldwork problems in coordination with the PL. The <br /> FTL/Site Supervisor should try to resolve the issue so that work can continue; however, should the <br /> variance/incident/problem affect the contracted scope of work or a project decision made from the <br /> evaluation of date,the resolution must be coordinated with PgM and SWE Field QC Manager if corrective <br /> action is needed.The PgM should notify the SWE Quality Assurance Manager of all corrective actions. <br /> 6.0 Documentation Review <br /> The FTL is responsible for the daily review of the fieldwork documentation for compliance with <br /> requirements (Section 4.0 "Procedures") and legibility. Errors and omissions should be explained and <br /> revisions to an entry signed and dated by the FTL. <br /> The PL is responsible for reviewing and signing approved documents stored in the project file (Section <br /> 4.1). <br /> 7.0 References <br /> U.S. Department of Defense, 2013. DoD Environmental Field Sampling Handbook, Revision 1.0.April. <br /> Page 15 of 15 <br />