Laserfiche WebLink
Water Quality Measurements Field Standard Operating Procedure <br /> SWE-FSOP-101;Revision 1 Ahtna Southwest Environmental Operations <br /> Field Forms — Any documentation that preserves an accurate historical record of field activities but is <br /> recorded on unbound paper. These forms should be referenced in the FLB. Each data entry field should <br /> have an entry or indicate that data for that field is not available or not required. <br /> [PFAS Project]: Record of field events will be maintained on loose paper(PFAS-free) secured on <br /> Masonite or aluminum clipboards. Plastic clipboards, binders, or spiral hard cover notebooks are not <br /> acceptable. Field logbooks are permanently assigned to a specific project. <br /> Field Logbook(FLB)—A portable, bound, weatherproof notebook with consecutively numbered pages. <br /> [PFAS Project]: Use field logbook made of standard/loose plain paper(non-weatherproof), held <br /> together by an aluminum or Masonite field clipboard. Alternatively, a spiral-bound notebook with <br /> non-weatherproof paper and/or cover can be used. <br /> Field Notepad—A unbound notepad or loose-leaf paper with consecutively numbered pages. <br /> 2.0 Relevant Documents <br /> This SOP focuses on the oversight and documentation of water quality parameter collection and should <br /> be used in conjunction with other applicable SOPS, including, but not limited to the following: <br /> Standard Operating Procedures <br /> • SWE-FSOP-001, Fieldwork Documentation <br /> • SWE-FSOP-002, Field Sample Management <br /> • SWE-FSOP-401, Active Groundwater Sampling <br /> • SWE-FSOP-403, Conveyance Water Sampling <br /> • SWE-FSOP-404, Open Water Sampling <br /> • SWE-FSOP-602, Well Development <br /> • SWE-FSOP-801, Equipment Decontamination <br /> Field Forms <br /> • SWE-FFRM-004, Daily PFAS Sampling Checklist [PFAS Projects] <br /> • SWE-FFRM-300, Active Groundwater Sampling <br /> • SWE-FFRM-301, Passive Groundwater Sampling <br /> • SWE-FFRM-303, Open Water Sampling <br /> • SWE-FFRM-402, Well Development <br /> • SWE-FFRM-801, Multi-Probe Calibration <br /> 3.0 Equipment List <br /> The list below identifies the staff's expected use of equipment while performing and/or supervising water <br /> quality measurement activities. <br /> • A bound, waterproof field logbook (FLB; e.g., Rite in the Rain"' or similar) with pre-numbered <br /> consecutive pages for field documentation <br /> Page S of 8 <br />