My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1100
>
2300 - Underground Storage Tank Program
>
PR0506504
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2026 12:34:54 PM
Creation date
4/1/2025 11:53:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0506504
PE
2361 - UST FACILITY
FACILITY_ID
FA0007464
FACILITY_NAME
MAIN STREET ARCO AM PM*
STREET_NUMBER
1100
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22119062
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1100 S MAIN ST MANTECA 95337
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Farm <br /> T. LINE LEAK DETECTOR TESTING <br /> ❑Check this box if Iin leak detectors ARE NOT installed. (Do not complete this section.) <br /> Simulated release rate verified. (Check all that apply.) Yes No NA <br /> x3 GPH 00.1 GPH❑ .2 GPH <br /> Has the testing apparatus been properly calibrated? x ❑ ❑ <br /> For emergency gene ator tank systems, does the LLD create an audible and visual alarm ❑ ❑ x <br /> when a leak is detected? <br /> For mechanical LLDs does the LLD restrict the flow through the pipe when a release is x ❑ ❑ <br /> detected? <br /> For electronic LLDs, c oes the turbine automatically shut off when a release is detected? ❑ ❑ x <br /> For electronic LLDs, c oes the turbine automatically shut off if any portion of the monitoring ❑ El x <br /> system is disabled or disconnected? <br /> For electronic LLDs, oes the turbine automatically shut off if any portion of the monitoring ❑ ❑ x <br /> system malfunctions pr fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for 11 El x <br /> kinks and breaks? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? x ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? x ❑ <br /> LLD 1D LLD Model Lines Monitored Pass Fail <br /> T1 VMI99 D2000 87 x ❑ <br /> T2 VMI99 1)2000 DIESEL x ❑ <br /> T3 FE ST -MLD 91 x ❑ <br /> ❑ ❑ <br /> ❑ 0 <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> Describe all answers marked "No"or "Fail"and proposed remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.