Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN TANK GAUGING TESTING <br /> XCheck this box if tar k gauging is used only for inventory control. <br /> ❑Check this box if N 3 tank gauging equipment is installed. Yes Na, I,YA'. <br /> Do not com lete his section if either box is checked. <br /> All wiring has been. 1) visually inspected for kinks, breaks and proper entry and termination; ❑ Cl <br /> and 2 tested for qrOL,nd faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ❑ ❑ <br /> ensure that floats move freely, functionally tested, and confirmed operational? <br /> Was accuracy of sys em's product level readings tested? ❑ ❑ <br /> Was accuracy of sys em's water level readings tested? ❑ ❑ <br /> Were all probes rein talled properly? ❑ ❑ <br /> Were all items on thE equipment manufacturer's maintenance checklist completed? ❑ ❑ <br /> Probe 1D F robe Model Tanks Monitored Pass Fail <br /> El <br /> ❑ ❑ <br /> S. COMMENTS <br /> Describe all answers marked "No"or"Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> 1) The 91 STP Sumg sensor was replaced "like for Like"Veeder Root model 794380-208. Inspector Aaron <br /> Madera on site. <br /> 10. MONITORING SITE PLAN <br /> Page 5 of 6 <br />