Laserfiche WebLink
4.3.5. Recommended method for supplemental heat is to transfer 4.4.7. Joint may take up to 24 hours to cure dependent upon the <br /> warm airto the tank sump while keeping ignition sources away. temperature. Allow adhesive to fully cure before moving the <br /> joined parts. <br /> EZ-FIT ADHESIVE JOINTS (KIT AD E) <br /> 4.4. Kit contents:This kit is designed for Adhesive Joints, HAND LAYUP JOINTS (KIT LK) <br /> 4.5. Kit Contents: This kit is designed for Hand Layup Joints. <br /> Items Size Qty. Items Size Qty. <br /> Mix Instructions Sheet(INST6072) 1 Pair Rubber Gloves X-Large 1 <br /> SDS for Resin (INST 6070) 1 Plastic Roller 3/4 in.x 3 in. 1 <br /> SDS for Hardener(INST 6071) 1 Felt Roller Handle 3 in. 1 <br /> Putty Knife 1 Felt Roller Pad 3 in. 2 <br /> Resin 1 gal.can 1 Chopped Strand Fiberglass Mat 6 in.W x 33 in.L 15 <br /> Hardener 1 qt.can 1 Wooden Mixing Stick 1 <br /> Grout Bag 1 Mix Instruction Sheet(INST 6032) 1 <br /> Mixing Stick 1 SDS for Resin(ACC 5015)• 1 <br /> 4.4.1. Read the following instructions completely before applying SDS for Curing Agent(Cadox L-50A-VR) 1 <br /> adhesive to EZ-Fit channel (see Figure 4-1). <br /> Resin l gal.can 1 <br /> 4.4.2. Dry fit all tank sump components prior to sealingjoints as Curing Agent 5 gram tubes 15 <br /> outlined in Section 3. <br /> 4.4.3. Double-wall tank sump adhesive joints include two (2) EZ-Fit 4.5.1. Dry fit all tank sump components prior to sea lingjoints, <br /> adhesive channels perjoint, interior and exterior. as outlined in Section 3. <br /> 4.4.3.1. 42 in. and 48 in. diameter tank sumps require (1) adhesive 4.5.1.1. Gaps between two joints greater than in. must be <br /> kit per channel,totaling two (2) adhesive kits perjoint covered with maximum width 1 in. width tape to <br /> (one outside, one inside). prevent resin from running intojoint(See Figure 4-2). <br /> 4.4.3.2. 54 in. diametertank sumps require one (1) adhesive kit <br /> per interiorchannel and two (2) adhesive kits per exterior Figure 4-2. Layup Joint (Taped) <br /> channel,totaling(3) adhesive kits perjoint. Dimensions not <br /> 4.4.4. Thoroughly mix two part adhesive by hand or with a power Visually Proportional Tank Sump Body <br /> mixerfollowingthe mixing instructions contained in the <br /> adhesive kit. Pour into grout bag. t <br /> 4.4.5. With the tank sump components in place, fill the adhesive 4 in. <br /> Grind/Clean Max 1 in.width tape <br /> channel in one 3600 pass (see Figure 4-1). Matingsurface 1/2 in must be used to <br /> 4.4.6. When more than one adhesive kit will be required to fill the seal joint gap <br /> joint,fill the joint using two or more operators, each starting <br /> at the same place and going opposite directions filling the 4in. /zin. <br /> joint so the epoxy is uncured when they meet. Grind/Clean <br /> Mating Surface <br /> Figure 4-1.Adhesive Joint <br /> Tank Sump Body Tank Sump/Collar Tank Sump/Collar <br /> Exterior —Interior <br /> Adhesive Adhesive <br /> 4.5.2. The tank sump will be shipped with H-clips for positioning <br /> EZ-Fit EZ-Fit the body on the tanks' double-wall collar. With a two (2) piece <br /> Adhesive�� ��Adhesive tank sump,the top is shipped with 8 additional H-clips for <br /> Channel Channel positioning the tank sump components. <br /> 4.5.3. Double-wall tank sump hand layupjoints include both <br /> interior and exterior layups. <br /> channel 4.5.3.1. 42 in. and 48 in. diametertank sumps require one (1) <br /> Mesh layup kit for the interior layup and one (1) Layup kit for <br /> the exterior Layup,totaling two (2) layup kits perjoint. <br /> 4.5.3.2. 54 in. diameter tank sumps require two (2) layup kits for <br /> Tank Sump/Collar Tank Sump/Collar the interior layup and two (2) layup kits forthe exterior <br /> Exterior Interior layup, totaling four(4) layup kits perjoint. <br /> 4.5.4. Thoroughly mix resin and hardener following the mixing <br /> instructions in the layup kit. <br /> nov.com/fgs 5 <br />