My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2026 2:18:22 PM
Creation date
4/3/2025 9:30:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0527629
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0018721
FACILITY_NAME
COSTCO WHOLESALE #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2440 DANIELS ST MANTECA 95337
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.5.5. Resin coat previously ground mating surfaces on tank sump <br /> with felt roller. Figure 5-2. Fill/vapor Model <br /> 4.5.6. Apply 3 layers of fiberglass layup, saturated with resin,3600 <br /> around tank sump, centered on joint.All layupjoints must <br /> overlap a minimum of 1 in. but not exceed 2 in. in Multiport Watertight Lid <br /> circumferential direction (see Figure 4-3). Hydrostatic Reservoir o <br /> Figure 4-3. Layup Joint w/Electronic Sensor <br /> Enclosure Top <br /> Tank Sump Body Round Body Extension <br /> (Trim From Bottom For <br /> f Field Adjustment) <br /> 4 in. EZ-Fit Adhesive Joints <br /> Grind/Clean Layers of Fiberglass <br /> Mating Surface 3 in. w/Resin 3 in.past Polygon or Round <br /> Each Joint(Kit LK) Tank Sump Body <br /> EZ-Fit Adhesive Joints <br /> 4 in. 3 in. Containment Collar <br /> Grind/Clean <br /> Mating Surface Drain Plug <br /> j — — <br /> Tank sump/collar Tank sump/collar 5.5. Ensure gaskets are installed with the fins angled down away <br /> Exterior Interior g g . Y <br /> 4.5.7. Using the ribbed roller supplied in the kit, hand rollover entire from the lid (see Figure 5-3 and 5-4). <br /> surface of layup,working air bubbles from under the fiberglass <br /> mat, especially around H-clips. Figure 5-3.Tank Sump Gasket <br /> 4.5.8. Allow layup to cure at least hours without moving the joined <br /> parts.The surface of the layup should be hard; if not hard after Wiper Gasket <br /> 5 hours,wait up to 24 hours. <br /> S. ASSEMBLED TANK SUMPS Gasket Fins <br /> Angled Down <br /> Failure to properly test and seal joints may result in Molded <br /> product loss, environmental damage, explosion, or fire. Sump Top <br /> 5.1. All joints must be sealed with our supplied kits. <br /> 5.2. All piping and electrical penetrations (supplied by others) must <br /> seal the tank sump annularspace. <br /> 5.3. Do not connect the tank sump annularspace to any other Figure 5-4.Wraparound Tank sump Gasket <br /> annularspace. <br /> 5.4. Keep the tank sump lid,gasket and gasket groove free from Gasket Fins <br /> contaminates. Angled Down <br /> Figure5-1.Watertight Tank Sump w/Adhesive Joint <br /> Watertight Lid <br /> Hydrostatic Reservoir — Wiper Gasket <br /> w/Electronic Sensor — <br /> Enclosure Top Molded <br /> Sump Top <br /> Round Body Extension <br /> (Trim From Bottom For <br /> Field Adjustment) <br /> EZ-Fit Adhesive Joints 5.6. When installing lid, apply additional lubricant as needed. <br /> Polygon or Round 5.7. If necessary, step on lid perimeter until properly seated. <br /> Tank Sump Body 5.8. NON-WATERTIGHT Tank sump:The lid will fit loosely on the <br /> EZ-Fit Adhesive Joints tank sump top and will not be watertight. <br /> Containment Collar <br /> Drain Plug <br /> Heber Glass Systems I KOY fgssales@nov.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.