|
restricted access to the product and the site.This limited war- Torque Specification:
<br /> ranty also shall not apply to any product which has been al- Spill Container 4"NPT,125 ft-Ibs minimum to 250 ft-Ibs max-
<br /> tered in any way,which has been repaired by anyone other imum.
<br /> than a service representative authorized by OPW,or when 4"Nipple:4"NPT,125 ft-Ibs minimum to 250ft-Ibs maxi-
<br /> failure or defect is due to: Improper Installation or mainte-
<br /> nance(including,without limitation,failure to follow Flex- mum.
<br /> Works Quick Reference Manual Installation Guide and all NOTE: All 4"NPT threads are to be torqued progressive-
<br /> product warning labels);abuse or misuse;violation of health ly lower from the tank up.
<br /> or safety requirements;use of another manufacturer's,or Drain Valve clamps:5/16-18 UN thread,11.5 ft-Ibs minimum
<br /> otherwise unauthorized,substances or components;soil or to 13.5 ft-Ibs maximum.
<br /> other surface or subsurface conditions;or fire,flood,storm, Nipple Adaptor Bolts:3/8-16 UN,20 ft-Ibs minimum to 25 ft-
<br /> lightning,earthquake,accident or any other conditions, Ibs maximum.
<br /> events or circumstances beyond OPW's control.
<br /> THIS LIMITED WARRANTY IS IN LIEU OF ALL OTHER WARRAN- Inner Ring and Lower Bellows Ring Bolts: 3/8-16 UN,15 ft-
<br /> TIES,EXPRESS OR IMPLIED,AND ALL OTHER WARRANTIES Ibs minimum to 20 ft-Ibs maximum.
<br /> INCLUDING,WITHOUT LIMITATION,THE WARRANTIES OF Tools Recommended:
<br /> MERCHANTABILITY AND FITNESS FOR A PARTICULAR PUR- 1-3100-TOOL-Torque Installation Tool
<br /> POSE,ARE HEREBY EXCLUDED. DW-VAC-TEST-Vacuum Test Equipment
<br /> OPW shall have no other liability whatsoever,whether based SC-TEST-Sealable Test Cover
<br /> on breach of contract,negligence,gross negligence,strict
<br /> liability or any other claim,Including,without limitation,for OPW 1-2200 SERIES GRADE LEVEL SPILL CONTAINER
<br /> special,incidental,consequential or exemplary damages or INSTALLATION INSTRUCTIONS:
<br /> for the cost of labor,freight,excavation,clean-up,downtime, Step 1: (See Figures 1 and 2)
<br /> removal,reinstallation,loss of profit,or any other cost or
<br /> charges.No person or entity is authorized to assume on be- Determine riser pipe height. "L"is the distance between
<br /> half of OPW any liability beyond this limited warranty.This the top of the riser pipe and finish grade.
<br /> limited warranty is not assignable. NOTE:The spill container height(from riser to grade)is
<br /> • Date of manufacture on this product is located on the L+
<br /> Inner ring of the bucket.
<br /> Model Series "L"Dimension
<br /> In some states it is prohibited to use spill container drain
<br /> valves on spill containers that are exclusively used for vapor 5 Gal.(Cast Iron Base) L=15 5/13"(40 cm)
<br /> return risers. install only 1-2200 Series Thread-On spill con- 15 Gal.(Cast Iron Base) L=17 3/8"(44 cm)
<br /> tainer models equipped with a drain plug.
<br /> WARNING:If the inner ring,lower bellows ring,bellows,or Step 2:
<br /> base is removed for any reason,follow the Operation and De-burr and thoroughly clean riser pipe. Apply Maintenance instruction as noted. Replace o-rings and seals g y pp ppy pipe
<br /> and install new ones. Never reuse damaged o-rings or seals dope to riser threads. Pipe dope is to be a non-
<br /> as it may result in an improper seal.Only qualified,compe- hardening, gasoline resistant pipe thread seal com-
<br /> tent,well-trained technicians should perform maintenance. pound.
<br /> Common sense and good judgment should always beexer- NOTE:Groundriserpipe to nearest grounding rod.
<br /> cised. The contractor's understanding of all related site con- Step 3:
<br /> ditions prior to starting the project is essential. If the con-
<br /> tractor does not have a clear understanding of the required Install spill container by rotating the mounting ring until
<br /> work and site conditions,the contractor is advised to seek hand tight.
<br /> clarification prior to starting any portion of the project. NOTE:Do NOT attempt to completely tighten the con.
<br /> NOTICE TO DELIVERY DRIVER: All delivery drivers MUST tainer using the mounting ring. Doing so may cause the
<br /> inspect the inside of the container for water orcontami- unit to fail.
<br /> nants other than fuel prior to delivery. If water or contami- Step 4:(See Figure 2)
<br /> nates are present,then they MUST be removed before pro-
<br /> ceeding. Dispose of towels and debris safely and per all ap- Finish tightening the spill container base using the
<br /> plicable local,state,and federal codes. After delivery is com- wrenching boss or with the 1-3100-TOOL.Torque to 125
<br /> plete,the driver MUST drain any excess fuel that may have ft-Ibs min.to 250 ft-Ibs max(4" NPT). 1-3100-TOOL can
<br /> spilled into the container from their delivery hose. be used to set final torque (see 1-3100-TOOL instruc-
<br /> tions), NOTE: Per PEI RM00 Section 5.11, support the
<br /> tainer rain valve
<br /> ve has been
<br /> manufactured
<br /> andThisttested
<br /> Spillthe spill container after installing before backfilling.
<br /> tainer drain valve has been manufactured and tested to the
<br /> following specifications:Leak Rate to be less than or equal
<br /> to 0.17 CFH @ 2.0"W.C.
<br /> P�3
<br />
|