My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2026 8:08:05 PM
Creation date
4/7/2025 8:42:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231667
PE
2361 - UST FACILITY
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4075 E MAIN ST STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G Finish rode <br /> Step 5:(See Figures 2&3) <br /> Remove Nipple Adaptor from spill container.Apply pipe <br /> dope to nipple and install in Nipple Adaptor. Pipe dope <br /> is to be a non-hardening, gasoline resistant pipe thread <br /> seal compound. Use only factory made nipples.Torque <br /> nipple to 725 ft-Ibs min.to 250 ft-Ibs max. (4" NPT). 1- <br /> 3100-TOOL can be used to set final torque.Torque value <br /> is based on rotation at the center of pipe. For standard <br /> covers install rotatable adaptor and dust cap per manu- <br /> Figuret facturers' instructions. For sealable cover (1SC) models, <br /> install a standard 4"pipe cap to support adjustment sys- <br /> tem.(Adaptor and dust cap must be installed in sealable <br /> cover(SC) models after concrete has dried. Install drop <br /> Slope I"Min. tube, overfill prevention valve and/or loose jack screw <br /> Inner Ring Finish Grade assembly if used (61JSK-44CB) per manufacturers' in- <br /> structions.Reinstall the Nipple Adaptor in spill container. <br /> Mounting Ring Torque Nipple Adaptor bolts to 20 ft-Ibs minimum to 25 <br /> ft-Ibs maximum. <br /> NOTE:Nipple length is determined by measuring from <br /> the bottom of the threaded portion of the base to the <br /> bottom of the cover. Then subtract 2"minimum for <br /> clearance,height of adaptor and height of cap. Range <br /> ncre Dri of nipple lengths that can be used in all of the OPW spill <br /> containers:4"min to 9"max.(See Figure 6) <br /> p Step 6:(See Figures 4&8) <br /> 1 If necessary,the height of the spill container can be ad- <br /> Dust Cap justed by ±1.5" (3.8cm). If it is necessary to increase <br /> Rotatable Adaptor height, install adjusting system(sold separately for 5 gal- <br /> Nipple Ion models, part number H12267) beneath tabs on <br /> mounting ring. See Figure 4 for standard cover models <br /> Nipple Adaptor and Figure 8 for sealable cover models. Add shims as <br /> needed and adjust with screw(shims must be cut to size <br /> Lower Bellows Ring for sealable cover models). <br /> ' m <br /> - - Grounding Lug NOTE: The adjustment should not be more than 1.5" <br /> Wrenching Boss from the initial length of the unit. <br /> Step 7: <br /> Where applicable, upon preliminary installation perform <br /> 4 Riser Pipe the CARB Test Procedure TP-201.1C or equivalent. This <br /> Test Procedure will check the seals between the drain <br /> valve,nipple,bases,and rotatable adapter. <br /> NOTE:Follow all state and local required testing on the <br /> Figure 2 primary and secondary buckets. <br /> Clamp Nipple to Prevent Rotation When Tightening Step 8:(See Figure 7) <br /> Verify torque on mounting ring bolts. Torque to be 15 ft- <br /> Ibs minimum to 20 ft-Ibs maximum. <br /> r+ <br /> j Perform a hydrostatic test on the spill container. To test <br /> C � - Nipple the spill container base and bellows, fill the container <br /> with water. A drop in the water level of 1/8" or greater <br /> 1 M after one hour means that a leak exists. To determine <br /> where the leak is, look for a steady stream of bubbles <br /> r Nipple Adaptor coming from one of the joints or water leaking on the <br /> outside of the bucket. NOTE: Do not drain the water <br /> � into the UST after the test is complete.Water must be <br /> ` 1-3100-TOOL disposed of per local requirements for hazardous <br /> Figure 3 �(�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.