Laserfiche WebLink
From:Saeed, Haza [EHD] <br />To:Ralph Roberts <br />Cc:Manzo, Elena K. [EHD]; Alaniz, John [EHD]; Suszycki, Michael [EHD]; SMLZ@pge.com <br />Subject:RE: C-30 Tank Closure Notification - PG&E MCD Island UGSF <br />Date:Wednesday, March 26, 2025 2:15:00 PM <br />Hi Ralph, <br />Thanks for the notification. As you stated below, the HMBP will need to be updated within 30 days <br />and the SPCC needs to be amended within 6 months. Keep disposal records onsite and will be <br />reviewed during the next routine inspection. <br /> <br />Please let me know if you have any questions. <br /> <br />Best Regards, <br /> <br />Haza <br /> <br />From: "Roberts, Ralph" <RPRb@pge.com> <br />Date: March 26, 2025 at 12:29:08 PM PDT <br />To: EH-Directors <EH-Directors@sjgov.org> <br />Cc: "Lillie, Sheilah" <SMLZ@pge.com> <br />Subject: C-30 Tank Closure Notification - PG&E MCD Island UGSF <br /> <br />Classification: Internal <br /> <br />To Whom It May Concern: <br /> <br />(1) Prior to initiating cleaning, cutting, dismantling, or excavation of a tank system, the <br />owner or operator of the tank system shall notify the appropriate CUPA in writing of the <br />information specified below. If there is no CUPA, then the owner or operator shall notify <br />the LIA and send a copy to the authorized agency. However, information already provided <br />to the CUPA, authorized agency or LIA pursuant to compliance with another statutory or <br />regulatory requirement need not be resubmitted: <br /> (A) The location of the tank system: PG&E MCDI Underground Gas Facility, Whiskey <br />Slough Station, 2121 Zuckerman Rd. Stockton, CA 95206 <br /> (B) The date(s) the tank system will be cleaned and/or excavated, or closed in place: <br />The tank is scheduled to be cleaned on 4/7/2025. After it is cleaned the tank will be removed <br />from the pad and cut up for metal recycling. The off-haul date of the scrapped tank has not <br />been determined. <br /> (C) A brief description of the tank system; The tank is a 27000-gallon aboveground single- <br />walled steel tank. The tank rests on a concrete pad. The tank contains natural gas production