Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure 0 Vacuum ❑ Hydrostatic <br /> Test Equipment Used:vacuum gauge <br /> Tank ID 87-2 87-1 91 <br /> Tank Manufacturer Owens Corning Owens Corning Owens Corning <br /> Tank Capacity 10K 10K sic <br /> Test Start Time 9:22 9:35 9:55 <br /> Initial Reading -10ingh -10inhg -10inhg <br /> Test End Time 10:22 10:35 10:55 <br /> Final Reading -10inhg -10inhg -10inhg <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria +-0 +-0 +-0 <br /> Tightness Test Results p Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> Test Type 0 Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used:Pressure Guage <br /> Pipe Run ID 87-1 87-2 91 <br /> Pipe Manufacturer Ameron Ameron Ameron <br /> Test Start Time 9:45 9:45 9:45 <br /> Initial Reading 5psig 5psig 5psig <br /> Test End Time 10:45 10:45 10:45 <br /> Final Reading 5psig 5psig 5psig <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria +-0 +-0 +-0 <br /> Tightness Test Results p Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />