Laserfiche WebLink
General Notes - Mechanical jmw_ _ <br /> sign <br /> MECHANICAL 713 Washingtonstreet <br /> 78028 <br /> ALL EQUIPMENT AND MATERIALS SHALL BE NEW AND SHALL BE EQUAL TO, OR GREATER IN QUALITY AS 830.890.8808/831 :• 1 <br /> THOSE SPECIFIED. OWNER/ DESIGN PROFESSIONAL SHALL APPROVE ANY AND ALL SUBSTITUTIONS PRIOR <br /> TO PURCHASE AND INSTALLATION. ADJUSTMENTS TO CONSTRUCTION AND/OR ACCESSORIES ON Sacramento,ca.916.980.9165 <br /> SUBSTITUTED EQUIPMENT MAY BE REQUIRED TO ACHIEVE THIS EQUALITY, AND SHALL BE INCLUDED AT NO jmwellsdesign@gmail.com/ <br /> ADDITIONAL COST TO THE OWNER. <br /> jackmwells@outlook.com <br /> INSTALL ALL EQUIPMENT, MATERIALS AND PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL COPY RIGHT 2 0 24 <br /> APPLICABLE CODES. APPLICABLE CODES SHALL INCLUDE, BUT NOT LIMITED TO THE 2019 CALIFORNIA NOT PUBLISHED.ALL RIGHTS RESERVED BY DESIGNER. DRAWINGS <br /> AND SPECIFICATIONS AS INSTRUMENTS OF SERVICE ARE AND SHALL <br /> MECHANICAL CODE, 2019 CALIFORNIA CODE OF REGULATIONS (CCR), 2019 CALIFORNIA FIRE REMAIN THE PROPERTY OF THE DESIGNER.THEY SHALL NOT BE USED <br /> REGULATIONS, 2016 CALIFORNIA GREEN BUILDING STANDARDS AND 2016 CALIFORNIA TITLE 24 ENERGY ON OTHER PROJECTS OR EXTENSIONS TO THIS PROJECT EXCEPT BY <br /> AGREEMENT IN WRITING AND WITH APPROPRIATE COMPENSATION TO <br /> EFFICIENCY STANDARDS. WHERE HEAVIER GAGES OF MATERIALS, INCREASED SIZING AND/ OR MORE THE DESIGNER.CONTRACTOR IS RESPONSIBLE FOR CONFIRMING AND <br /> WILL NOT <br /> STRINGENT REQUIREMENTS THAN ABOVE MENTIONED CODES ARE REQUIRED BY THE CONTRACT BE RRON RESPIONSIBLENS IONS FORA CONSTRTHE JOUCTION SITE, HEMEEASNS, METHODS, <br /> DOCUMENTS,SUCH INCREASED REQUIREMENTS SHALL APPLY. TECHNIQUES, SEQUENCES OR FOR SAFETY PRECAUTIONS AND <br /> PROGRAMS IN CONNECTION WITH THE PROJECT. <br /> FABRICATE AND INSTALL DUCTWORK IN ACCORDANCE WITH THE LATEST EDITION OF SMACNA GUIDELINES �������� <br /> FOR DUCT CONSTRUCTION ANT THE 2019 CALIFORNIA MECHANICAL CODE. ALL DUCT JOINTS SHALL <br /> INCLUDING FLANGED JOINTS BE SEALED WITH SILVER TAPE, OR ARABOL AND CANVAS. JOINTS EXPOSED Company, LLC <br /> F TO WEATHER SHALL BE SEALED WITH ARABOL AND CANVAS. PROVIDE BRANCH DUCTS WITH VOLUMNE <br /> DAMPERS WITH LOCKING QUADRANTS LOCATED AT LEAST FIVE FEET (5) FROM THE GRILLE OR DIFFUSER Daryl Jordan,P.E. <br /> SERVED. PO Box 467 <br /> Mount Hermon,CA 95941 <br /> SUPPORTS FOR ALL PIPING AND DUCTWORK SHALL BE IN ACCORDANCE WITH THE SMACNA GUIDELINES (209) 485-8620 <br /> FOR SEISMIC RESTRAINT OF MECHANICAL SYSTEMS. CONSTRUCTION SHALL PROVIDE CALCULATIONS FOR �FESSIQ <br /> ISOLATORS AND MOUNTING ACCEPTABLE TO THE REVIEWING AGENCY/ AUTHORITY WHEN REQUIRED BY ��pQP.�L CORD�F ••• <br /> SAME. <br /> O 1 ALL RECTANGULAR OR ROUND DUCTS SHALL BE OF SMACNA GAGE GALVANIZED STEEL OR ALUMINUM, Q <br /> 2 <br /> A4.0 j UNLESS OTHERWISE NOTED. PROVIDE FLAT SEAM CONSTRUCTION FOR ANY DUCTS EXPOSED IN OCCUPIED <br /> SPACE. NOTE:ALUMA-FLEX IS NOT ACCEPTABLE IN LIEU OF ROUND RIGID DUCTWORK. <br /> FLEXIBLE DUCTWORK WHERE PERMITTED SHALL BE GENFEX IL, THERMAFLEX G-KM, CASCO OR EQUAL. J e CIV1L <br /> FLEXIBLE DUCT SHALL NOT EXCEED 5-0 IN LENGTH (DOWNSTREAM OF RIGID ELBOWS) PER 2019 CMC, �` Co CA��E� <br /> I I i <br /> 603.4.1 INSULATE ALL SUPPLY AND RETURN DUCTS WITH 2" THICK, 3/4 PCF DENSITY O-C F OR EQUAL, <br /> FIBERGLASS DUCT WRAP, TYPE IV, WITH FACTORY APPLIED FLAME RETARDANT FOIL REINFORCED KRAFT <br /> I I <br /> FACING. LAP JOINT MINIMUM OF 4",AND SECURE WITH GALVANIZED STEEL WIRE. <br /> LINE ALL SUPPLY AND RETURN AIR DUCT DROPS FOR A MINIMUM OF 10'-0 FROM THNE UNIT WITH 1"THICK date of issue/revisions: <br /> j O-C F AEROFLEX TYPE 200 OR EQUAL ACOUSTIC DUCT LINER. INSTALL WITH 100% COVERAGE OF <br /> r --- I --------------y ADHESIVE, AND FURTHER APPLY MECHANICAL PIN FASTENERS WHERE DUCT SIDE EXCEED 24". DUCT no. date description <br /> DIMENSIONS ARE NET INTERNAL DIMENSIONS. SEAL BUTT ENDS OF EXPOSED INSULATION IN THE DUCTS WITH <br /> MANUFACTURES RECOMMENDED SEALANT OF ADHESIVE. <br /> I i <br /> photo cell <br /> CONTROLS SHALL COMPLY WITH THE 2019 CALIFORNIA ENERGY CODE. ALL CONTROLS AND CONTROL <br /> WIRING NOT SPECIFICALLY SHOWN BUT REQUIRED FOR A COMPLETE AND WORKABLE SYSTEM SHALL BE <br /> r SUPPLIED BY THE CONTRACTOR AND INSTALLED AT NO ADDITION COST TO THE OWNER. <br /> ALL AIR SYSTEMS SHALL BE BALANCED BY A QUALIFIED MECHANICAL CONTRACTOR, USING AABC, <br /> 77[t <br /> SMACNA OR NEBB PROCEDURES. AIR QUANTITIES SHALL BE BALANCED TO NOT MORE THAN 10%ABOVE <br /> OR 0%BELOW THE QUANTITIES SHOWN ON THE DRAWINGS. CONTRACTOR SHALL SUBMIT A COMPLETE AIR <br /> BALANCE REPORT INDICATING AS A MINIMUM M THE AIR DELIVERY FOR EACH DIFFUSER, THE FINAL <br /> O O OPERATING DATA FOR THE SYSTEMS AND THE AIR CONDITIONING UNITS. <br /> I i <br /> i <br /> I i , �-------- SUBMIT FOR APPROVAL (6) COPIES OF COMPLETE SUBMITTAL DATA ON SPECIFIED AND PROPOSED <br /> P P EQUIPMENT AND MATERIALS. SUBMITTALS SHALL INCLUDE EQUIPMENT SIZES, CAPACITY, MOTOR <br /> LOCATIONS, PERFORMANCE CURVES AND OTHER PERTINENT DATA. EACH SUBMITTAL SHALL INCLUDE <br /> IDENTIFICATION TAGS OR SYMBOLS TO MATCH DRAWINGS. PARTIAL SUBMITTALS OR SUBMITTALS NOT <br /> MARKED WITH EQUIPMENT TAGS OR PERFORMANCE DATA WILL BE REJECTED. <br /> I ' ' <br /> PROVIDE PERMANENT ENGRAVED PLASTIC NAME PLATE FOR ALL EQUIPMENT INSTALLED, INDICATING THE <br /> PLAN DESIGNATION OF THE UNIT; (AC-1, REF., etc) AND BUILDING AREA SERVED (DINING, KITCHEN, etc.) <br /> ' STAMPED METAL TAPES APPLIED WITH SELF-CONTAINED ADHESIVE WILL NOT BE ACCEPTABLE. <br /> I II <br /> 77 <br /> j I CONTRACTOR SHALL VERIFY ALL WORK CONDITIONS PRIOR TO COMMENCING WORK, INCLUDING, BUT <br /> NOT LIMITED TO: DIMENSIONS, EQUIPMENT, STRUCTURAL ELEMENTS AND MATERIALS INDICATED AS <br /> EXISTING,AS WELL AS THE COORDINATED INSTALLATION OF ALL NEW WORK,MATERIALS, EQUPIMENT,etc. <br /> COORDINATED THE LOCATION OF ALL ROOF TOP EQUIPMENT WITH THE STRUCTURAL ENGINEER. Ito <br /> I <br /> I I I CONTRACTOR SHALL FIELD COORDINATE AND INSTALL PACKAGED ROOFTOP EQUIPMENT TO MAINTAIN A C <br /> j MINIMUM 10'-0 CLEARANCE OUTSIDE AIR INTAKE TO ALL EXHAUST OUTLETS AND VENT THRU ROOF(VTR). <br /> r::: ❑ I O SUBMITTAL NOTE: MECHANICAL SYSTEMS DESIGN REFLECT EQUIPMENT SPECIFIED. WHEN EQUIPMENT <br /> j I SUBSTITUTIONS OCCUR AND DUCT DESIGN, DUCT DROPS, GAS INPUT AND ELECTRICAL SERVICE VARIES rM <br /> FROM THAT SPECIFIED, IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR FOR ALL O C <br /> ADDITIONAL ENGINEERING FEES AND OTHER DISCIPLINE CHANGE ORDERS (ARCHITECTURAL,STRUCTURAL, O <br /> ELECTRICAL PLUMBING,etc.)WHEN SUBSTITUTED EQUIPMENT IS USED. • <br /> I _ <br /> it •� L <br /> -------------------- <br /> --- ------ ---- ---------- ---- --- -H <br /> I II <br /> AUTOMATIC SHUTOFF <br /> IL I <br /> I I I Automatic Shut-Off For HVAC Q <br /> I 11 I <br /> O2 _ <br /> Section 608.0,2019 CMC-Automatic Shutoffs <br /> ❑ � — —— 2016 California Mechanical Code (CMC) <br /> o Section 608.1 Air-Moving, Systems and Smoke Detectors. Air-moving systems supplying air in excess of <br /> 2,000 cubic feet per minute (CFM) to enclosed spaces within a building shall be equipped with an O <br /> ' automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the +.J <br /> air-moving equipment upon detection of smoke in the main supply-air duct served by such equipment. O <br /> RETURN Duct smoke detectors shall comply with UL 268A, shall be labeled by an approved agency, approved O O 'C <br /> ftlR and listed by California State Fire Marshal, and shall be installed in accordance with the manufacture's L- C <br /> I installation instructions. Such devices shall be compatible with the operating velocities, pressures, -J w <br /> d ELECG7RIGAL SUPPANEL temperatures, and humidities of the system. Where sire-detection or alarm systems are provided for the v1 e� <br /> 125 amp Min building,the smoke detectors shall be supervised by such systems in an approved manner,and installed U <br /> in accordance with NFPA 72 and the California Building and Fire Codes 2019 Editions. , 1 <br /> H C <br /> Definition:Air-moving system.A system designed to provide heating,cooling,or ventilation in which one = W O <br /> P fi SIR HANDLER or more air-handling units are used to supply air to a common space or are drawing air from a common :C111110 O Mitsubishi Electric plenum or space. MSUZ-KA30NAHZ split system = 0208/230v 1 ph,60HzCode Interpretation: All commercial/industrial buildings having one tenant are considered to be one M N <br /> -- <br /> 3 common enclosed space. Q Q <br /> SUPP IY CONDENSER <br /> 1 i photo cell Mitsubishi Electric In multi-tenant commercial/industrial buildings, each tenant space may be considered one common <br /> <.; ,SIR I PEAD-A30AA split system enclosed space if no openings are provided in the demising walls between such tenants. <br /> 208/230v 1 ph,60Hz <br /> tZ <br /> If multiple air-moving systems are provided for one common enclosed space, and the aggregate cfm 31 <br /> Pexceeds <br /> 2,000 cfm, shutoff for smoke control is required. For the purpose of calculating the total <br /> pI aggregate cfm,air moving systems which serve only a designated area or room may at the discretion of <br /> O the administrative authority not be required to be equipped with shut-offs for smoke control. _ <br /> I <br /> photo cell I Duct smoke detectors required in air-moving systems shall transmit an alarm signal to either (1) the fire <br /> 3 I alarm panel which is supervising the building fire sprinkler system and valve tamper or (2) to a separate <br /> stand-alone remote indicator panel (second fire alarm panel)supervising the duct detectors exclusively. <br /> o --------------------------------------------J-----------------------------a Activation of any duct detectors shall cause a visual and an audible signal in a normally occupied area. <br /> 0C'4 <br /> z I Plan Checks: Plan check and approval of the fire alarm system, if connected to the building fire \ <br /> O sprinkler system,is regulated by the Fire Marshal. If a stand-alone remote system,the Building Division will O <br /> plan check the system. The plans submitted to the Building Division for a building permit to construct the <br /> z tenant improvements to the building shall indicate how the automatic shut-down is performed. The "� M <br /> CO N location of panels and annunciation shall be shown on the electrical plans. If a remote system, a sign w Z <br /> shall be placed next to the horn and light stating, "When horn and light are on,the smoke detectors in O <br /> HVAC systems have activated". w --I U <br /> OI c <br /> O Inspections: An inspection to determine that the air-moving system is shut off by the smoke detector is in <br /> I I <br /> regulated by the building inspector. Inspection of the building fire sprinkler and alarm system is regulated w U a 8 <br /> by the fire inspector.In some cases the building and fire inspectors may conduct a joint inspection. Z Q G o <br /> 11 i It- O � <br /> Lii Note:All five exceptions to section 608.1 are applicable. <br /> 1-10 <br /> 011 1 aa - dmrn <br /> O WOo w � Z � 000 <br /> PLAN O r�O 0No 0 CD <br /> -� NORTH I' U <br /> r N N <br /> I <br /> sh eet contents <br /> z <br /> PPROXIMAT3 Mechanical <br /> O NORTH <br /> U <br /> Mechanical Schematic Schematic <br /> 01 1/4"= 1 -0 <br /> Z <br /> O project no <br /> U 9162024 <br /> drawn by <br /> Iw THESE DRAWINGS ARE FOR THE <br /> m <br /> EXPRESS USE OF checked by <br /> c i JMW/DJ <br /> o Created Heating and Cooling project architect <br /> Z o CREATED HEATING AND COOLING <br /> STATEMENT OF RESPONSIBILITY <br /> 3 2216 Snyder Ave. <br /> Modesto, Ca. 95356 <br /> n CREATED HEATING AND COOLING SHALL CHECK AND VERIFY ALL ASPECTS OF DESIGN I ENGINEERING,AND SHALL ENSURE THAT ALL plot date 06242024 <br /> N WORK CONFORMS TO CURRENT CODES AND INDUSTRY STANDARDS. CREATED HEATING AND COOLING SHALL BE RESPONSIBLE FOR I IC # 974610 sheet number <br /> Q ALL ENGINEERING AND DRAWINGS AND SHALL PLACE HIS OR HER NAME, SIGNATURE, LICENSE NUMBER AND DATE ON THE <br /> CONSTRUCTION DRAWINGS SO AS TO INDICATE SUCH RESPONSIBILITY (PRIOR TO START OF WORK) . ANY MODIFICATIONS TO THE <br /> DRAWINGS,CALCULATIONS,OR FIELD CONDITIONS SHALL BE CREATED HEATING AND COOLING RESPONSIBILITY. BY BEGINNING ALL OTHER USE BY WRITTEN MEP DISCLAIMER: <br /> WORK,CREATED HEATING AND COOLING AGREES TO THE ABOVE STATEMENT OF RESPONSIBILITY. JMW ELLS DESIGN is not a engineering firm.The mep design/system and and/or elements,either noted or implied,are foreg neral <br /> mepl <br /> PERMISSION ONLY OF guideline purposes only. These drawings have not been reviewed by a licensed Engineer, (unless an official stamp of an licensed <br /> U engineer appears on these drawings). it is the responsibility of the owner and General Contractor to obtain the services of a licensed • <br /> O 974610 CREATED HEATING AND COOLING Engineer to review these drawings prior to construction. By accepting these drawings,JMWELLS Designer/Jack Wells is released from <br /> 0 <br /> all liability for any MEP defects and/or failures. <br /> PRINTED NAME LICENSE NUMBER DATE SIGNATURE Of <br /> 0 - - <br />