Laserfiche WebLink
STEP 20: PREPARE FILL 111M FOR VALVE AN ERTION <br /> IMPORTANT' intpecl I he f is er pipe f or a ny f 0 reig ri <br /> mater4l. Over spray from tank relining or any intemal <br /> burn inslde of plpe must be removed)odor to Installa- <br /> tion. Failure to have an umbsbucted riser pipe may <br /> prevent proper installation or opeWlon of the vake. <br /> Thwougtdy Mean top of rises pipe. <br /> STEP 21; REMME ELASTIC BAND <br /> Remove th4c elastic band securing the float to the valve <br /> body. The float will more into an outward position. <br /> STEP 22. INSERT DROP TU BE <br /> Make sure the upper 0-Ring gasket is under the flange <br /> cFtheinlet wbe. Hold the float down against the valve <br /> body and,51awly Insert the drop tf,be overfill valve into <br /> the riser pipe. Do not fo"wafve Into the riser pipe_ if Firim <br /> aryl obstrurtk)n or foreign tastier ioretferrex with Make sure that the Hoar is aligned along the length of <br /> smooth}„perttan of the rralVer"le riser pipe must tM' the tank.. The length of the tank can ftsliy be deter- <br /> cleared. mined by locattr+g other manholes or pump boxes that <br /> are installed around othertank fitting& look into the <br /> REIN drop tube and align the deflemr with The length of aw <br /> Failure to follow the as somhly tank <br /> ■nd Ins lhOm lrwtrwctbns or <br /> uso of excewV0 force to Imart : Unthread the socket adap- <br /> the OPW 71 SO vAN VOIDTHE tar assembly from the inlet tube(a W square<1rive <br /> WARRANTY. exteniiOn will attach to the socket adaptor.secure alf <br /> tools to ensure they don't fal I into the to rik or valve)and <br /> Dlfhr-uity Pn ff*mc Any the ex'minq ensure float and poppet nxwe freely when s«dretjpiep- <br /> bll tube rif there is orre)means for assern*Is pulied on. When looiaing down into the <br /> there may be an tbstrucWD in the u pper tube enriure popW is visible when socket adap- <br /> riser pipe. Look for burrs,defor- tar is pultecl and resets properly when*socket adaptor is <br /> matiorrs,excess tank linirrg rnated- released, 'See page 17 For fui11 testing details_ if poppet <br /> A of other projecdcm that may does 410t actuate freety take appropriate steps to coxrm <br /> interfere with easy insertk)o of the before proceeding. <br /> OPW 71 SO. The 71 SO is d ig ned <br /> For insertkm into schedule 40 pipe. if ph;wv22 CAUTION: No abstructW in the tank can be within <br /> scttedu le So pipe has been used for the 114'from the center of the rianr pipe or"valve <br /> riser,+e 71$0 cannot be Instalied. 1f warned pipe has may nat aparatepropuriy(See Figure 24). <br /> been used,t'he iritema'i weld bead may interfere with <br /> the OPW 71 SO and prevent InstaWkt 5n. it the 0FW STEP 24s I UGH VALVE <br /> 71 SO won't slip in easily DONT FORCE IT! Damage to Install the UPW Jack Screw IGI and a+4` NPT ripple to <br /> the valve maY result if excess force is used. Examine the lack the valve to place. Refer to the Installation Instruc- <br /> rlsor pipe carefuil V,determine the nature of die obstruc- tions supplted with the Jack Screw Kit. FortarstnlAe <br /> dory take appropriate seeps to ftWnovv i c. nwodel s ensure that the racket adaptor is a[Vrmt so <br /> it does trot i ntarfwre with the Jack screw kit.(s ee F ig <br /> STEP 23: C14ECK fNSTALLATIM ure 24A). Install the rotatable Product Adaptor(Refer <br /> Invert the drop tube al'I the way Into the tank until the to Installation Instructions sullied with the Product <br /> flange and gasket seat onto the top of the Face Seal Adaptor.) Make sure that the valve does not rotate <br /> Adaptor. The Float will swing out into the operating while ti g h te&ng the adaptor by obsenri rig the position <br /> positon as"rT pssms ipw the tAi%k, Cd me deflector. TM iron"mat mvr Aw"d dXV <br /> thnLLnStk. 11elvg tank or IrL 54wp 3a, nrp tat t#,i3 srrp <br /> as necessary to assureproper valve alignment. <br /> 14 <br />