My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAROLYN WESTON
>
601
>
2300 - Underground Storage Tank Program
>
PR0546181
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2026 3:15:51 PM
Creation date
7/3/2025 12:56:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0546181
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0026131
FACILITY_NAME
7-ELEVEN INC. #38616
STREET_NUMBER
601
Direction
W
STREET_NAME
CAROLYN WESTON
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16422019
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
601 W CAROLYN WESTON BLVD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vapor Recovery Fill Riser <br /> OPW <br /> 1 <br /> Ball Float <br /> 14"PA nim urn <br /> Clearance for <br /> Tube Cut Float 4" NPT <br /> per Local <br /> iequirernents Nipple <br /> a <br /> �— Allyn Float Along Length of T'a nk --.w. Swivel <br /> Product a Jack <br /> Adaptor Screw <br /> Kit <br /> Orient socket <br /> adaptor FOR TESTABLE MODELS ONLY: Check Mmila[ion <br /> t^wreen jack agal n as done in Step 23 to ensu re poppet actuates and <br /> screw Wts resets properly, See page 17 for fub testing details Ap- <br /> ply pipe dope to the socket adaptor threads. Pipe dope <br /> sharid he a non-hardening gasollne resistant pipe <br /> thread seal compound. Install socket adaptor and <br /> torque to 3.5 ftAbs(42 In-ts)minimum to 5.O ft-lhs(64 <br /> In-lbs) maximum, After in stal ling socket adaptor where <br /> regO red,pressure test testable owrfi II valve per CARR <br /> TR201.1 O to ensure value is vapor tight <br /> Figure 24A <br /> 7S <br />
The URL can be used to link to this page
Your browser does not support the video tag.