Laserfiche WebLink
Underground Storage Tank <br />Monitoring System Certification Form <br />7. LINE LEAK DETECTOR TESTING <br />LJ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br />Simulated release rate verified: (Check all that apply.) <br />A 3 GPH 11 0.1 GPH El 0.2 GPH <br />Yes <br />No <br />NA <br />Has the testing apparatus been properly calibrated? <br />A <br />EJ <br />J <br />For emergency generator tank systems, does the LLD create an audible and visual <br />alarm when a leak is detected? <br />848480-001 <br />SUP. PROD. LINE <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a <br />release is detected? <br />For electronic LLDs, does the turbine automatically shut off when a release is <br />detected? <br />Li <br />Ll <br />DSL PROD. LINE <br />® <br />Ll <br />F] <br />For electronic LLDs, does the turbine automatically shut off if any portion of the <br />monitoring system is disabled or disconnected? <br />11 <br />For electronic LLDs, does the turbine automatically shut off if any portion of the <br />mon itorincsystem malfunctions or fails a tightness test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected <br />for kinks and breaks? <br />® <br />J <br />Ll <br />23 <br />0 <br />F] <br />Were all items an the equipment manufacturer's maintenance checklist completed? <br />A <br />L) <br />Ll <br />Were all LLDs confirmed operational within regulatory requirements? <br />0 <br />J <br />D <br />LLD ID <br />LLD Model <br />Lines Monitored <br />Pass <br />Fail <br />Q1 <br />848480-001 <br />REG. PROD. LINE <br />RI <br />Li <br />Q2 <br />848480-001 <br />SUP. PROD. LINE <br />[� <br />Q3 <br />848480-001 <br />DSL PROD. LINE <br />® <br />Q <br />Lj <br />11 <br />El <br />Li <br />Il <br />Q <br />Li <br />Ij <br />L] <br />D <br />D <br />D <br />D <br />Ll <br />Q <br />❑I <br />El <br />Describe all answers marked "No" or `Fail" and proposed remedy in Secrlon 9. <br />List all monitoring equipment either replaced or repaired irr Section 9 <br />Page 4 of 6 <br />