My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ATHERTON
>
1222
>
2300 - Underground Storage Tank Program
>
PR0547926
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 8:17:35 PM
Creation date
7/10/2025 9:09:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0547926
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0027325
FACILITY_NAME
CHEVRON #385102
STREET_NUMBER
1222
Direction
W
STREET_NAME
ATHERTON
STREET_TYPE
DR
City
MANTECA
Zip
95337
APN
22616041
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1222 W ATHERTON DR MANTECA 95337
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Monitoring System Certification Form <br />8. Ifs -TANK GAUGING TESTING <br />j <br />Z Check this box if tank gauging is used only for inventory control. <br />L Check this box if NO tank gauging equipment is installed. <br />Do not complete this section if either box is checked. <br />Yes <br />No <br />NA <br />All wiring has been: 1 j visually inspected for kinks, breaks and proper entry and <br />termination; and 2) tested for ground faults? <br />❑ <br />❑ <br />❑ <br />Were all in -tank gauging probes visually inspected for damage and residue buildup <br />to ensure that floats move freely, functionally tested, and confirmed o erational? <br />L <br />❑ <br />❑ <br />Was accuracy of system's product level readings tested? <br />Lj <br />❑ <br />L) <br />Was accuracy of system's water level readings tested? <br />❑ <br />❑ <br />❑ <br />Were all probes reinstalled properly? <br />❑ <br />❑ <br />❑ <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />❑ <br />El❑ <br />Probe ID <br />Probe Model Tanks Monitored <br />Pass <br />Fara <br />Lj <br />Li <br />Lj <br />Lj <br />Ll <br />❑ <br />Q <br />Q <br />® <br />Q <br />❑ <br />❑ <br />9. COMMENTS <br />Describe all answers marked "No' or ''Fail°' and proposed remedy. <br />List all monitoring equipment either replaced or repairers. <br />L9 Diesel fill 209 sensor was replaced. <br />E1 communication alarm upon arrival. <br />Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.