Laserfiche WebLink
Revised Quarterly Monitoring Report – <br />Fourth Quarter/Annual 2024 <br />www.arcadis.com <br />Revised - Forward Landfill 4Q24 Quarterly Mon Report 06262025 20 <br />submitted on August 1, 2024. The reporting period for this report was third quarter 2023 through second quarter <br />2024. Time-series plots of total VOC concentrations with historical data are included in the 2024 Annual <br />Corrective Action Evaluation Report (Arcadis 2024f). <br />Overall total VOC concentrations have generally decreased or remained static following implementation of <br />corrective action measures. Historically, monitoring wells AMW-13 and AMW-22S have exhibited the highest total <br />VOC concentrations downgradient of the Site. During the monitoring period, one or more VOCs exceeded state <br />maximum contaminant levels in wells AMW-1, AMW-13, AMW-18B, AMW-22, AMW-22S, AMW-23M, AMW-24R, <br />AMW-46, AMW-50M, and AMW-51M, AMW-58S, and domestic well 8106-A (Tables 3a through 3c and 10). <br />The corrective action system was previously addressed in four quarterly corrective action progress reports <br />(Arcadis 2024b, 2024e, 2024j, 2025b) and four quarterly groundwater treatment system monitoring reports <br />(Arcadis 2024a, 2024d, 2024i, 2025a) during 2024. The corrective action system at the Site consisted of <br />operational five groundwater extraction wells (EW-1, EW2, EW-3R, EW-4, and EW-5) and an associated <br />treatment system during 2024. The available data suggest that VOC mass recovery increased significantly after <br />extraction well EW-5 became operational. <br />6.5 Leachate Monitoring <br />In accordance with the RWQCB-approved Leachate Recirculation Plan dated March 3, 2017 (Forward 2017), and <br />MRP Section D.1 (MRP Tables 25 through 28 [RWQCB 2024a]), leachate recirculation is performed at the Site. <br />According to the Forward Landfill Operations Manager, leachate recirculation was performed at the Site during <br />fourth quarter 2024 for dust suppression activities. <br />Forward Landfill personnel inspect leachate sumps and surface impoundments weekly at the Site. If leachate is <br />present in a sump, it is pumped either into surface impoundment WMU F (North) or WMU F (West) for <br />evaporation. A total of 2,133,400 gallons of leachate was pumped into the two surface impoundments during 2024 <br />(Section 6.3). <br />During 2024, leachate was observed in leachate holding areas F-Leachate Pond, D-88A/B, D-89, D-93/95, WMU <br />D-01N/S, WMU D-02, and F-North, and a total of 775,800 gallons of leachate was pumped into surface <br />impoundment WMU-F (North) from these leachate holding areas (Section 6.3). <br />During 2024, leachate was also observed in leachate holding areas WMU FU-03, WMU FU-04E/W, WMU FU-05, <br />WMU FU-06, FU-17, FU-19W/E and F-West and a total of 1,357,600 gallons of leachate was pumped into surface <br />impoundment WMU-F (West) from these leachate holding areas (Section 6.3). <br />Quarterly flow rates are summarized in Section 4.1.3. Documentation for the first three quarters of 2024 was <br />provided in previous quarterly monitoring reports (Arcadis 2024c, 2024g, 2024k). <br />Quarterly monitoring for field parameters was previously conducted during first, second, and third quarters 2024 <br />(Arcadis 2024c, 2024g, 2024k). The fourth quarter 2024 field results and annual laboratory analytical results are <br />discussed in Section 4.1.3. <br />Freeboard observations are summarized in Section 4.1.3. Documentation for the first three quarters of 2024 was <br />provided in previous quarterly monitoring reports (Arcadis 2024c, 2024g, 2024k). <br />