Laserfiche WebLink
Revised Quarterly Monitoring Report – <br />Fourth Quarter/Annual 2024 <br />www.arcadis.com <br />Revised - Forward Landfill 4Q24 Quarterly Mon Report 06262025 19 <br />footprint identify areas where refuse fill was placed with the contour values designating the thickness of waste that <br />was placed in the area. <br />The second figure provides an isopach between the final grading plan and the most recent topographic map. The <br />contours in blue designate the additional fill thickness that can be placed to reach the final grades. The areas <br />labeled as “Future” identify waste management units (WMU) that are yet to be constructed, and the numerical <br />values indicate the year in which the WMU is expected to be constructed and refuse filing initiated. For example, <br />Future WMU FU-26/27 indicates that the landfill unit has not yet been constructed but is planned to be <br />constructed and refuse filling initiated in 2026 or 2027. <br />Table 6-3 Annual Waste Types and Quantities <br />Category First Quarter <br />2024 <br />Second Quarter <br />2024 <br />Third Quarter <br />2024 <br />Fourth Quarter <br />2024 2024 Total <br />Friable asbestos waste <br />(tons) 887.95 1,075.06 1,137.32 1,128.52 4,228.85 <br />Sewage and wastewater <br />sludges (tons) 1,098.60 746.54 781.30 1,766.43 4,392.87 <br />Other non-hazardous waste <br />material (tons) 218,587.05 219,369.67 192,144.12 194,783.70 824,884.54 <br />Total solid waste (tons) 220,573.60 221,191.27 194,062.74 197,678.65 833,506.26 <br />Disposal area (WMU) FU-19 FU-19 and <br />FU-23 FU-19 FU-13 and <br />FU-23 <br />FU-13, FU- <br />19, and <br />FU-23 <br />Yard waste material (tons) 28,237.59 26,173.34 21,368.07 22,665.72 98,444.72 <br />Compost generated (tons) 10,094.25 14,226.44 9,755.63 14,125.83 48,202.15 <br />Liquid discharge to surface <br />impoundments, Forward <br />Unit (gallons) <br />191,100 338,700 137,500 108,500 775,800 <br />Liquid discharge to surface <br />impoundments, Austin Unit <br />(gallons) <br />354,400 465,100 189,100 349,000a 1,357,600 <br />Liquid discharge to surface <br />impoundments, total <br />(gallons) <br />545,500 803,800 326,600 457,500 2,133,400 <br />Notes: <br />a FU-19E was inaccessible due to flooding on December 26, 2024. Data for this location are from December 20, 2024. <br />6.4 Corrective Action Monitoring Program <br />A correction action program has been implemented at the Site to address VOC exceedances. As required by <br />MRP Section E.2.k (RWQCB 2024a), the 2024 Annual Corrective Action Evaluation Report (Arcadis 2024f) was