Revised Quarterly Monitoring Report –
<br />Fourth Quarter/Annual 2024
<br />www.arcadis.com
<br />Revised - Forward Landfill 4Q24 Quarterly Mon Report 06262025 19
<br />footprint identify areas where refuse fill was placed with the contour values designating the thickness of waste that
<br />was placed in the area.
<br />The second figure provides an isopach between the final grading plan and the most recent topographic map. The
<br />contours in blue designate the additional fill thickness that can be placed to reach the final grades. The areas
<br />labeled as “Future” identify waste management units (WMU) that are yet to be constructed, and the numerical
<br />values indicate the year in which the WMU is expected to be constructed and refuse filing initiated. For example,
<br />Future WMU FU-26/27 indicates that the landfill unit has not yet been constructed but is planned to be
<br />constructed and refuse filling initiated in 2026 or 2027.
<br />Table 6-3 Annual Waste Types and Quantities
<br />Category First Quarter
<br />2024
<br />Second Quarter
<br />2024
<br />Third Quarter
<br />2024
<br />Fourth Quarter
<br />2024 2024 Total
<br />Friable asbestos waste
<br />(tons) 887.95 1,075.06 1,137.32 1,128.52 4,228.85
<br />Sewage and wastewater
<br />sludges (tons) 1,098.60 746.54 781.30 1,766.43 4,392.87
<br />Other non-hazardous waste
<br />material (tons) 218,587.05 219,369.67 192,144.12 194,783.70 824,884.54
<br />Total solid waste (tons) 220,573.60 221,191.27 194,062.74 197,678.65 833,506.26
<br />Disposal area (WMU) FU-19 FU-19 and
<br />FU-23 FU-19 FU-13 and
<br />FU-23
<br />FU-13, FU-
<br />19, and
<br />FU-23
<br />Yard waste material (tons) 28,237.59 26,173.34 21,368.07 22,665.72 98,444.72
<br />Compost generated (tons) 10,094.25 14,226.44 9,755.63 14,125.83 48,202.15
<br />Liquid discharge to surface
<br />impoundments, Forward
<br />Unit (gallons)
<br />191,100 338,700 137,500 108,500 775,800
<br />Liquid discharge to surface
<br />impoundments, Austin Unit
<br />(gallons)
<br />354,400 465,100 189,100 349,000a 1,357,600
<br />Liquid discharge to surface
<br />impoundments, total
<br />(gallons)
<br />545,500 803,800 326,600 457,500 2,133,400
<br />Notes:
<br />a FU-19E was inaccessible due to flooding on December 26, 2024. Data for this location are from December 20, 2024.
<br />6.4 Corrective Action Monitoring Program
<br />A correction action program has been implemented at the Site to address VOC exceedances. As required by
<br />MRP Section E.2.k (RWQCB 2024a), the 2024 Annual Corrective Action Evaluation Report (Arcadis 2024f) was
|