My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_EW-5 INSTALL PERMIT PACKAGE 2/14/25
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2026 Reports
>
COMPLIANCE INFO_EW-5 INSTALL PERMIT PACKAGE 2/14/25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 9:40:07 AM
Creation date
7/18/2025 8:30:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
EW-5 INSTALL PERMIT PACKAGE 2/14/25
RECORD_ID
PR0440005
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
201060013, 5
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
9999 AUSTIN RD MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward Landfill - 3 - 27 December 2018 <br />temporary storage in above ground tanks until the water can be treated and disposed of <br />into the infiltration basin or disposed of in the class II surface impoundments is <br />acceptable. <br />• In addition to summarizing the hydraulic testing results, the Aquifer Testing Summary <br />Report shall include an updated conceptual site model for the Austin Road Unit that <br />includes geologic cross sections with the existing wells and newly installed wells (or <br />borings) along the Point of Compliance. <br />Please obtain all necessary boring and construction permits from San Joaquin County. Once <br />installed, the monitoring wells shall be sampled in accordance with Monitoring and Reporting <br />Program R5-2014-0006. The Monitoring Well Installation Report and Aquifer Testing Summary <br />Report are due no later than 15 April 2019. <br />All reports, including the Monitoring Well Installation Report and well completion logs shall be <br />uploaded to GeoTracker and an upload certification shall be e-mailed to <br />centralvalleysacramento@waterboards.ca.gov. To ensure that each submitted report is routed <br />to the appropriate staff, please include the following information in the body of the email: Attn: <br />Brendan Kenny, Compliance Unit, the date and title of the report, and the facility’s CIWQS place <br />ID (CW-225098). <br />If you have any questions regarding this review, please contact me at (916) 464-4635 or by <br />e-mail to bkenny@waterboards.ca.gov. <br />-Original Signed By- <br />BRENDAN KENNY <br />Engineering Geologist <br />Compliance and Enforcement Section <br />Enclosure: Requirements for Monitoring Well Installation Workplans and Reports <br />cc: Robert Mc Clellon, San Joaquin County Public Health Department, Stockton <br /> Aaron Hook, Arcadis, Irvine
The URL can be used to link to this page
Your browser does not support the video tag.