Laserfiche WebLink
Table 1Well Construction DetailsWell Installation and Interim Remedial Action ReportCalifornia Department of Corrections and RehabilitationStockton, California Well ID Date Installed Well Type Screen ZoneTotal Depth of Borehole (ft bgs)Total Depth of Well (ft bgs)Well Diameter (inches)Screen Top (ft bgs)Screen Bottom (ft bgs)Screen Length (ft)Slot Size (inches)Well Casing Elevation (ft amsl)Screen Top Elevation (ft amsl)Screen Bottom Elevation (ft amsl)AMW-60S 5/10/2024 Monitoring Shallow 80 77 2 57 77 20 0.010 40.89 -16.11 -36.11AMW-60M 5/8/2024 Monitoring Intermediate 130 112 2 102 112 10 0.010 40.31 -61.69 -71.69AMW-61S 7/24/2024 Monitoring Shallow 80 80 2 60 80 20 0.010 39.99 -20.01 -40.01AMW-61M 7/19/2024 Monitoring Intermediate 120 115 2 90 110 20 0.010 39.97 -50.03 -70.03CDCR-EW-2 4/26/2023 Extraction Intermediate 128 128 6 103 123 20 0.020 38.05 -64.95 -84.95CDCR-EW-3 7/26/2024 Extraction Intermediate 127.5 120 6 80 and 90 85 and 115 Total 30 0.020 39.75-40.25 and -50.25-45.25 and -75.25CDCR-EW-4 5/7/2024 Extraction Intermediate 125 122.5 692.5 and 102.597.5 and 117.5Total 20 0.020 39.41-53.09 and -63.09-58.09 and -78.09Acronyms and Abbreviations:amsl = above mean sea levelft = feetbgs = below ground surfaceCDCR = California Department of Corrections and RehabilitationID = identificationPage 1 of 1