My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_EW-5 INSTALL PERMIT PACKAGE 2/14/25
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2026 Reports
>
COMPLIANCE INFO_EW-5 INSTALL PERMIT PACKAGE 2/14/25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 9:40:07 AM
Creation date
7/18/2025 8:30:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
EW-5 INSTALL PERMIT PACKAGE 2/14/25
RECORD_ID
PR0440005
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
201060013, 5
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
9999 AUSTIN RD MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> www.arcadis.com 1/6 <br />SUBJECT TO <br />CDCR Site Investigation Mr. Brendan Kenny <br />and Remedial Design Work Plan Second Addendum Engineering Geologist <br /> Central Valley Regional Water Quality Control Board <br /> <br />DATE OUR REFERENCE <br />February 1, 2023 30158195 <br /> <br />DEPARTMENT <br />Environment <br /> <br /> <br /> <br /> <br />On behalf of Forward Inc., Arcadis U.S., Inc. (Arcadis) has prepared this California Department of Corrections and <br />Rehabilitation (CDCR) Site Investigation and Remedial Design Work Plan Second Addendum (Second Work Plan <br />Addendum) to further describe the expanded interim remedial design scope of work proposed following a virtual <br />technical meeting held with the Regional Water Quality Control Board (RWQCB) on September 26, 2022 (meeting <br />slides provided as Attachment 1). The expanded interim remedial design was presented to the RWQCB in a <br />weekly update email dated October 14, 2022, and in a subsequent Technical Memorandum submitted to the <br />RWQCB in November 2022 (Arcadis 2022a, Attachment 2). In an email dated January 25, 2023, the RWQCB <br />requested that previously submitted technical information be complied into a work plan addendum to facilitate <br />review of the revised remedial design scope of work, including proposed well construction details an d schedule. <br />The CDCR property (site) is located on Newcastle Road approximately 1,500 ft to the north of the Forward <br />Landfill located at 9999 South Austin Road in Manteca, California (the Landfill). <br />The CDCR Site Investigation and Remedial Design Work Plan Addendum (Work Plan Addendum) submitted to <br />the RWQCB in October 2021 (Arcadis 2021) provided an update to the Background and Proposed Scope of Work <br />sections presented in the CDCR Site Investigation and Remedial Design Work Plan (Work Plan) which was <br />submitted to the RWQCB in October 2019 (Arcadis 2019). The Work Plan (Arcadis 2019) and Work Plan <br />Addendum (Arcadis 2021) proposed a multi-phased site investigation (SI) on the CDCR property to delineate the <br />nature and extent of potential release(s) and volatile organic compound (VOC) source masses beneath the CDCR <br />property, leading to an interim remedial design and implementation. Following discussions with the RWQCB in a <br />virtual meeting held on February 7, 2022, the Revised CDCR Site Investigation and Remedial Design Work Plan <br />Addendum (Revised Work Plan Addendum) was submitted in March 2022 (Arcadis 2022b) based on direction <br />from the RWQCB to prioritize installation of the interim remedial action on the CDCR property prior to the <br />completion of the proposed SI activities. <br />In accordance with the Revised Work Plan Addendum (Arcadis 2022b), t he first phase of the interim remedial <br />design and testing was completed in May 2022, and the first phase of SI activities were conducted in June and <br />July 2022. The results of these field efforts were communicated to the RWQCB in the September 26, 2022, virtual <br />meeting noted above and are included as Attachment 1. The additional hydraulic and water quality data collected <br />during the shallow zone groundwater extraction well installation and testing effort have expanded the interim <br />remedial efforts to the intermediate groundwater zone beneath the CDCR property to enable capture of the VOC <br />plume mass. This Second Work Plan Addendum presents an expanded scope of work for the interim remedial <br />action presented in the Revised Work Plan Addendum (Arcadis 2022b).
The URL can be used to link to this page
Your browser does not support the video tag.