Laserfiche WebLink
Remediation System Well Abandonment Work Plan JACOBS <br /> 6. Works Cited <br /> Central Valley Regional Water Quality Control Board (CV-RWQCB). 2018. Central Valley Regional Water <br /> Quality Control Board Response to:Response to Comments on the Pilot Study Completion Report, <br /> Pacific Gas and Electric Company, Las Vinas Dehydrator Station, San Joaquin County. January 26. <br /> Central Valley Regional Water Quality Control Board (CV-RWQCB). 2019. RE: Central Valley Regional <br /> Water Quality Control Board Response to Pilot Study Completion Report Addendum, Pacific Gas and <br /> Electric Company, Las Vinas Dehydrator Station, San Joaquin County. January 28. <br /> CH2M HILL Engineers, Inc. (CH2M). 2016. Remediation Well Abandonment, Las Vinas Dehydrator <br /> Station, San Joaquin County, California. August 2. <br /> CH2M HILL Engineers, Inc. (CH2M). 2017. Pilot Study Completion Report, Las Vinas Dehydrator Station, <br /> San Joaquin County, California. December. <br /> ETIC Engineering, Inc. (ETIC). 2019. 2019 Annual Groundwater Monitoring and Remediation Report, Las <br /> Vinas Dehydrator Station, Pacific Gas and Electric Company, San Joaquin County, California. October <br /> 23. <br /> Jacobs Engineering Group, Inc. (Jacobs). 2018. Pilot Study Completion Report Addendum, PG&E Las <br /> Vinas Dehydrator Station, San Joaquin County, California. December 27. <br /> B11204191849AKT 6-1 <br />