My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0544730
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 3:10:16 PM
Creation date
8/12/2025 2:04:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544730
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0025419
FACILITY_NAME
NESTLE USA INC FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
230 INDUSTRIAL AVE RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Central Valley Regional Water Quality Control Board <br /> June 30, 2025 <br /> Page 3 <br /> mark each drilling location and notify Underground Service Alert at least 72 hours prior to the start of <br /> fieldwork. Each location will be screened for utilities by a private utility locator prior to any ground <br /> disturbance and will be manually cleared to a minimum depth of 5 feet bgs using a hand auger or other <br /> soft digging techniques. <br /> DRILLING AND WELL CONTRUCTION METHODS <br /> Haley&Aldrich will subcontract a California C-57 licensed drilling contractor to advance the proposed <br /> borings using sonic drilling methods. Each location will be continuously cored, and soil will be logged by <br /> a field geologist under the supervision of a California Professional Geologist in general accordance with <br /> ASTM International Standard D2488 (Standard Practice for Description and Identification of Soil, <br /> Visual-Manual Procedure). Soil cores will also be screened for organic vapors using a photoionization <br /> detector.The target depths and construction details for the proposed monitoring wells and piezometers <br /> are as follows: <br /> • North Area Treatment System Piezometers:Two piezometers (PZ-01 and PZ-02) will be <br /> constructed of 2-inch, Schedule 40 polyvinyl chloride (PVC), with approximately 5 feet of PVC <br /> machine-slotted screen (with 0.010-inch slots).The target screen intervals will intercept the first <br /> coarse-grained unit encountered within the screened interval for each injection well. For IW-1 <br /> (PZ-01),the approximate interval expected is 65 to 70 feet bgs and for IW-2 (PZ-02),the <br /> approximate interval expected is 60 to 65 feet bgs. Note that these screen intervals are <br /> estimated based on the lithology observed during the installation of the injection wells;the <br /> actual screen intervals will be determined in the field based on the subsurface lithology <br /> encountered. Each well will be capped at the bottom with a threaded stainless-steel endcap. <br /> • Monitoring Well M-57C1: Groundwater monitoring well M-57C1 will be constructed of 2-inch, <br /> Schedule 80 PVC, with up to 10 feet of PVC machine-slotted screen (with 0.010-inch slots). <br /> Based on previously drilled and sampled nearby locations, it is likely that the C1 Zone will be <br /> encountered between 115 and 140 feet bgs. Monitoring well M-59C1,which is located <br /> approximately 100 feet north of the Walnut Avenue System extraction wells, is screened from <br /> 125.1 to 130.1 feet bgs.The proposed screen interval for M-57C1 will target between 130 and <br /> 140 feet bgs; however, the final constructed depth will be determined based on the lithology <br /> observed in the field. <br /> Once drilling has reached the desired depth for each proposed well,the wells will be constructed inside <br /> the sonic drill casing. For both piezometer and monitoring well locations, the annular space around the <br /> well will be backfilled with#2/12 filter sand (or equivalent)to approximately 2 feet above the top of the <br /> screen interval. A 2-foot transition seal of bentonite will then be placed above the filter sand. Finally, a <br /> sanitary seal of neat cement grout will be placed up to just below the ground surface. For deeper <br /> monitoring well locations, neat cement grout will be placed in multiple lifts to reduce the potential for <br /> damage to the casing. All annular materials will be placed while incrementally retracting the sonic drill <br /> casing from the ground.The wells will then be completed with flush-mounted well boxes set in concrete <br /> and finished to match the existing surface conditions.The proposed locations for PZ-01, PZ-02, and M- <br /> 57C1 are shown on Figure 2. <br /> RICH <br />
The URL can be used to link to this page
Your browser does not support the video tag.