Central Valley Regional Water Quality Control Board <br /> June 30, 2025 <br /> Page 5 <br /> Schedule and Reporting <br /> Upon Water Board approval of this Work Plan, it is anticipated that well installation activities will be <br /> conducted during the summer of 2025, contingent upon timely approval of permits and subject to driller <br /> availability. Upon completion of well installation and sampling activities,the field methods, construction <br /> details, boring and well completion logs, and sampling results will be submitted to the Water Board in a <br /> well installation report. <br /> Please do not hesitate to contact us if you have any questions or comments. <br /> Sincerely yours, <br /> HALEY&ALDRICH, INC. <br /> tviJ nifer , .G. <br /> Geologist <br /> 4henne Waldman, P.G. <br /> Associate Geologist <br /> Peter Bennett, P.G., CHG <br /> Principal Hydrogeologist <br /> Enclosures: <br /> References <br /> Figure 1—Site Location Map <br /> Figure 2— Proposed Piezometer and Monitoring Well Locations <br /> c: Nestle USA, Inc.; Attn: Greg Bosiljcic <br /> Nestle USA, Inc.; Attn: Christina Armstrong <br /> Ripon Public Library;Attn: Melinda Kopp <br /> San Joaquin County Public Health Services;Attn: Adrienne Ellsaessar, R.E.H.S. <br /> City of Ripon; Attn: Kevin Werner <br /> City of Ripon; Attn:James Pease <br /> https:HhaleyaIdrich.sharepoint.com/sites/NestleUSATeam/Shared Documents/0130215.NestleRipon/Deliverables/2025_06 Piezometer Installation <br /> WP/2025_0630_Piezometer and Monitoring Well Installation WP_F.docx <br /> RICH <br />