My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0544730
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 3:10:16 PM
Creation date
8/12/2025 2:04:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544730
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0025419
FACILITY_NAME
NESTLE USA INC FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
230 INDUSTRIAL AVE RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Central Valley Regional Water Quality Control Board <br /> June 30, 2025 <br /> Page 6 <br /> References <br /> 1. ASTM International, 2017. Standard Practice for Description and Identification of Soils (Visual- <br /> Manual Procedures), Designation D2488-17e1. <br /> 2. California Regional Water Quality Control Board, Central Valley Region, 2006. Cleanup and <br /> Abatement Order No. R5-2006-0720 for Nestle USA, Inc., San Joaquin County.July 20. <br /> 3. California Regional Water Quality Control Board, Central Valley Region, 2023. Revised <br /> Monitoring and Reporting Order No. R5-2014-0815-03,Third Revision, California Water Code <br /> Section 13267,for Nestle USA, Inc., Former Ripon Processing Plan, San Joaquin County. May 15. <br /> 4. Haley&Aldrich, 2021. Draft North Area Groundwater Interim Remedial Action Plan, Former <br /> Nestle USA, Inc. Facility, 230Industrial Avenue, Ripon, California.June 15. <br /> 5. Haley&Aldrich, 2022. Revised Quality Assurance Project Plan, Former Nestle USA, Inc. Facility, <br /> Ripon, California. November 29. <br /> 6. Haley&Aldrich, 2025a. Final2025 Revised Water Replacement Contingency Plan, Former Nestle <br /> USA, Inc. Facility, Ripon, California. April 29. <br /> 7. Haley&Aldrich, 2025b. Final Remedial Action Plan, Former Nestle USA, Inc. Facility, Ripon, <br /> California. May 16. <br /> RICH <br />
The URL can be used to link to this page
Your browser does not support the video tag.