Laserfiche WebLink
; SCAFFOLD ❑Follow safe work Practices: <br /> I ❑Supported scaffold 1 • Identify/coordinate operations with the scaffold"Competent Person." <br /> ❑Suspended scaffold 1 • Supported scaffold level,stable,proper attachments,tiebacks,planking, <br /> i ❑Free-standing/mobile scaffold i • Suspended scaffolds anchored properly. <br /> 1 • Guardrails or personal fall apparatus required above 10 feet. <br /> Hazards: 1 • Proper means of accessing scaffold(proper ladders,stair tower);don't climb scaffold frames. <br /> See general fall hazards,above • Total height of free-standing scaffold shall not exceed four times the minimum base dimension. <br /> Equipment collapse • Don't exceed load limits,distribute loads evenly,stage materials in quantities sufficient for immediate use. <br /> HSE Program Documents:HSE SOP-648:Scaffolds <br /> AERIAL BOOM/SCISSOR LIFT ❑Follow safe work Practices: <br /> Hazards: I • Operators shall be trained and certified. <br /> See general fall hazards,above • Equipment is inspected after mobilization and is in good condition. <br /> Struck-by,run-over,tip over • Harness&lanyard worn whenever operating a boom lift(optional for scissors lift). <br /> Caught between(pinch points) 1 • Overhead hazards and surface obstructions shall be reviewed with operators prior to use. <br /> Fluid leaks/fuel hazards or j <br /> battery-related hazards <br /> i HSE Program Documents:HSE SOP-650:Manlifts and Aerial Lift Platforms(safe operation of mobile equipment) <br /> ❑ WARNINGI Confirmed or possible ❑Follow safe work practices per D.11.,"Utility-Related Hazards" <br /> close proximity to OVERHEAD <br /> ELECTRICAL UTILITY LINES. HSE Program Documents:HSE SOP-434o:Overhead and Underground Utility Hazards(US-only) <br /> D.5. HAND TOOLS(Manual,Hand-Powered) ®Applicable ❑ Not Applicable, Not Anticipated <br /> Site-Specific Notes&Clarifications: Hand tools maybe used during this project to clear brush,breakup and move old well pad components.Hand augers will <br /> be used by a driller to clear boring locations,as needed after private utility locating. <br /> ® MANUAL HAND TOOL INJURIES M Proper tool for the job,maintain in good condition,use vise/clamp to hold work piece,proper follow through, <br /> ❑Struck by i Self and nearby personnel shall stay clear of"line of fire,"use appropriate work gloves,keep blades sharp,use <br /> ❑Pinch points/crushing injuries wrist strap when dropped tool poses a hazard. <br /> i ❑Puncture 1 ®Utility/folding/collapsible knives and fixed-blade knives/cutting tools are not permitted,unless specifically <br /> j authorized. Cutting tools with auto-retracting blades,or with enclosed/guarded blades are permitted. <br /> ®Cutting blade/laceration risk <br /> I Use cut-resistant heavy work gloves,as applicable. <br /> M Flying objects,eye hazards ❑Ground surface penetration(hand auger,probe)—requires utility clearance;see D.11."Utility-Related Hazards" <br /> ❑Other,describe above HSE Program Documents:HSE SOP-640:Manual Hand Tools <br /> ❑ i MUSCULOSKELETAL(MSK)HAZARDS 1 ❑For tools requiring high exertion(shovel,hand auger,sledgehammer,pickaxe,slide hammer,similar):do <br /> 1 ❑Risk of acute physical MSK trauma stretching exercises to prepare,clear hazard zone,use stable body position,take rest breaks,avoid overexertion. <br /> I i <br /> t (strains,sprains,soft tissue injuries) ❑For recognized musculoskeletal hazard,acute or chronic,resulting from unsafe acute exertion,or <br /> ❑Risk of cumulative/chronic MSK ergonomic/repetitive motion/cumulative trauma risks,seek advice on controls from Corporate HSE Dept. <br /> trauma,repetitive motion injuries <br /> i HSE Program Documents:HSE SOP-205a:Manual Materials Handling/Back Injury Prevention <br /> D.6. POWERED TOOLS&EQUIPMENT(For Drilling&Heavy Equipment,see D.7&D.8) ®Applicable ❑ Not Applicable, Not Anticipated <br /> Site-Specific Notes&Clarifications: <br /> Electrically powered equipment maybe used during this project,including fans for use as engineering controls. Gasoline powered generators will be used to power this <br /> equipment. <br /> ® Type of powered tools/equipment: I ®General safe work Practices for operation of Powered tools and equipment: <br /> ®"Power tools" • Inspect before each use to ensure safe operating condition. <br /> ❑Powered portable equipment i • Clear personnel from hazard zone;keep personnel out of the"line-of-fire;'heed warning labels/signage. <br /> i ❑Powered fixed equipment I • Arrange worksite for safe access to equipment and sufficient work area clearance for safe use oftool;confirm <br /> 1 no overhead obstructions;ensure adequate illumination. <br /> Energy/power source: • Secure long hair/loose clot hing/hanging jewelry near moving/rotating parts. <br /> ❑DC battery or solar-powered . Ensure point-of-operation,mechanical power transmission,other moving parts are guarded with protective <br /> ®AC electric-powered 1 devices(as applicable);do not override interlocks,guards,protective devices. <br /> ®120V Do not make any equipment modifications that create a greater hazard or bypass safety design features. <br /> ❑240V • Use tool/equipment in accordance with manufacturer's use and safety instructions. <br /> ❑480V • Use PPE and/or other safety protections,as appropriate,for eye/hearing/hand/head/body protection. <br /> El Extension/flexible cords i <br /> • Provide training or verify operator competency for use of power tool/equipment. <br /> 1 • Use ventilation,wet methods,respirators,other applicable means to mitigate inhalation hazard. <br /> Project/Task Name:TR0712/Replacement of Monitoring Wells THA ver.4.0 <br /> Geosyntec THA Date:6/26/2025 Page 9 <br /> consultants <br />